S. No
 
Last Date of Submission
Posted Date

Request For Annual Qualification for Public Private Partnership in National Highways Projects.
NIT , RFAQ, Letter, Modified RFAQ, Amendment No. 1, Modified RFAQ-31.03.2011 ,Reply to Queries, Amendment No. 2,Extension of due datePreliminary Evaluation of RFAQAmendment , Amendment to Clarification
  

MODIFIED SCHEME OF HARMONIUS SUBSTITUTION- EXIT POLICY

New  Policy  Circular -  NHAI (Finance)

S/No

Circular No. & Date

Subject

1

NHAI/F&A/2016-17/CALA-Finance dated 31.05.2017 Central Land Acquisition Fund Management System, Agreement IndusInd, Agreement Kotak,

2

No. NHAI/2017/HAM/CGM(F) dated 22.03.2017 Value of Bank Guarantee (BG) to be furnished for availing mobilization advance in Hybrid Annuity Mode (HAM) Projects.

3

No. NHAI/2017/HAM/CGM(F) dated 16.03.2017 Format for furnishing Bank Guarantee (BG) for mobilization advance in Hybrid Annuity Mode (HAM) Projects.

4

NHAI/CGM/BOT(FIN) 2016-17 dated 06.12.2016

Suspension of collection of User fee at toll plazas on NHs due to demonetization of Rs. 500 & Rs. 1000 notes- Immediate relief to BOT (Toll) Concessions.

5

NHAI/CGM(F)/Measures to Revive/2016  dated 30.11.2016

Guidelines for release of 75% Arbitration Award under litigation, Corrigendum

6  

NHAI/CGM/BOT(FIN) 2016-17 dated 29.11.2016

Suspension of collection of User fee Immediate relief to BOT(Toll) Concessions.

7

NHAI/F&A/BOT/11019/27/2014 dated 06.05.2016

Empanelment of Chartered Accountants firms for appointment as Statutory Auditor/ Additional Auditor/ Concurrent Auditor for BOT  Projects under new Model Concession Agreement, Corrigendum. Corrigendum-ii.

8

NHAI/BOT/11019/2015-16  dated 08.01.2016

Financial Consultancy work for BOT (Toll) / BOT (Annuity)/Hybrid Annuity and OMT Projects - restructuring of stages and compensation for repetition for the stage etc.

9

NHAI/11033/CGM(FA)/4/2015 dated 19.11.2015

Permitting 100% equity divestment after two years of construction completion for all BOT Projects irrespective of year of award.

10

Policy Matters-Administration/ Finance 127/2013 dated 18.11.2013

Re-Financing/Re-structuring of Loan- NOC reg.,

11

NHAI/11033/CGM(FA)/4/2014 dated 29th January, 2014

Harmonious Substitution,

12

NHAI/11033/CGM(FA)/2015 dated 9.6.2015

One time fund infusion to revive and physically complete languishing  BOT projects.,

13

NHAI/11033/CGM/(FA)/4/2015 dated 9.6.2015

Permitting 100% equity divestment after two years of construction completion for all BOT Projects irrespective of year of award.,

14

NHAI/11033/CGM(FA)/4/2015 dated 09.09.2015

Permitting 100% equity divestment after two years of construction completion for all BOT Projects irrespective of year of award.,

15

NHAI/F&A/BOT/11019/27/2009 dated 23.01.2015

Empanelment of the firms of Chartered Accountants as Statutory Auditor/ Additional Auditor/ Concurrent Auditor for BOT (Toll)/BOT (Annuity) and other Projects under new Model Concession Agreement.

1 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Nemili Sriperumpudur fee plaza at km 37.800 [for a length of 46.500 km] for the section from km 106.800 to km 13.800 (Walajahpet - Poonamallee Section) of NH-4, in the state of Tamil Nadu.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

18th August  2017 (On e-Tendering Mode) 20th July  2017
2 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Chennasamudram fee plaza at km 104.900 [for a length of 46.500 km] for the section from km 106.800 to km 13.800 (Walajahpet - Poonamallee Section) of NH-4, in the state of Tamil Nadu under.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

18th August  2017 (On e-Tendering Mode) 20th July  2017
3 Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for;
(i) Construction of Elevated corridor at Sarojini Nagar and Banthara (Km. 14.300 & Km. 23.000) on Lucknow Kanpur Section of NH-25- (Length 4 Kms).
(ii) Construction of Elevated corridor from Shaheed Path to PGI (Km. 12.700 to Km.16.000) on Lucknow Raebareli Section of NH-24B (length 3.300Kms).
(iii) Construction of Elevated corridor from near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms).

Bid document,

19th August  2017 (On e-Tendering Mode) 20th July  2017
4 Consultancy Services for Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh.

Bid document

10th August  2017 (On e-Tendering Mode) 20th July  2017
5 Recruitment of various post under RO-Raipur on short term contract basis.

Advertisement,

31st July  2017 20th July  2017
6 Six laning & Strengthening of NH-248A from existing km 2.740 (Rajiv Chowk) to km 11.682 in Gurugram under NHDP Phase-IV in the State of Haryana on Hybrid Annuity Mode.

NIT, RFP, DCA & Non Technical Schedules, Technical Schedules, Schedule H Schedules, Drawings, Executive Summary, e-tender Process,

4th September  2017 (On e-Tendering Mode) 20th July  2017
7 Maintenance of existing carriageway and essential safety measures of proposed four laning of Hoskote - Dobbaspet Section of NH207 from Km. 58+300 to Km. 138+320 in the State of Karnataka - at the Risk and Cost of the Concessionaire M/s Transstroy Hoskote Dobbaspet Tollways Pvt. Ltd. (Second Call)

NIT, Bid Vol-I, Bid Vol-II, Financial Bid, BOQ,

24th July  2017 (On e-Tendering Mode) 20th July  2017
8 Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and crosssections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5 

NIT, Bid document, BOQ,

1st August  2017 (On e-Tendering Mode) 20th July  2017
9 Hiring of Vehicles (latest model) on monthly basis for NHAI RO - UP East, Lucknow

Bid Vol-I, Bid Vol-II,

21st July  2017 19th July  2017
10 Consultancy Services for Preparation of DPR for Additional Cross Drainage structures across water tank areas i.e Bridges, Culverts etc on the basis of Order of NGT & Revised MoEF Clearance for the section of Kerala / Tamil Nadu border to Villukkuri section from km 43/0 to km 70/250 of NH-47 and Villukuri to Kanyakumari from Km. 70.250 to Km. 96.714 section of NH-47 & Nagercoil to Kavalkinaru from Km. 0.000 to Km. 16.376 section of NH-47B under NHDP Phase-III in the State of Tamil Nadu on EPC Mode.

RFP, Financial Proposal,

23rd August  2017 (On e-Tendering Mode) 19th July  2017
11 Hiring of Vehicle on monthly basis for PIU- Hospet, Karnataka

NIQBid document

3rd August  2017 19th July  2017
12 Supply & fixing of prefabricated portable toilets (Ladies & Gents) under Swachh Bharat Mission at Paschim Madati Toll Plaza at Km 547.350 of NH-31 in the state of West Bengal. [Contract Package : 02/2017-18 (WB)].

NIQBid document

1st August  2017 19th July  2017
13 Supply & fixing of prefabricated portable toilets (Ladies & Gents) under Swachh Bharat Mission at Guabari Toll Plaza at Km 243.00 of NH-31C in the state of West Bengal. [Contract Package : 03/2017-18 (WB)]. 

NIQBid document

1st August  2017 19th July  2017
14 Supply & fixing of prefabricated portable toilets (Ladies & Gents) under Swachh Bharat Mission at Surjapur Toll Plaza at Km 451.00 of NH-31 in the state of West Bengal. [Contract Package : 04/2017-18 (WB)].

NIQBid document

1st August  2017 19th July  2017
15 Applications for the posts of Manager (Legal) & Manager (Admn) on deputation Basis in NHAI.

Advertisement & Application form,

29th September 2017 18th July  2017
16 Shifting of Water Supply Pipeline in Kagvadar-Una project (Pkg-IV) chainage Km.139+915 to Km.180+478 of NH-8E in the State of Gujarat.

NITBid Vol-IBid Vol-IIFinancial Bid

9th August  2017 (On e-Tendering Mode) 18th July  2017
17 Collection of Traffic Data by use of Automated Traffic Counter and Classification System supported with Video Based Traffic Survey on 24x7x365 basis in free flow mode of Traffic on Surat - Dahisar Section of NH-8 (New NH-48) Project Highway.

RFPBOQE-tender process

8th August  2017 (On e-Tendering Mode) 18th July  2017
18 Emergent Repair & Maintenance works contract for improvement of black spot identified by Police Department (ADGP, CID, (HP) on CMM road NH-21 (New NH-03) by Rock cutting at RD 237/292 to 237/312 near Markanda Temple Thalout in the state of Himachal Pradesh 

NIT

1st August  2017 18th July  2017
19 Procurement & Installation of Office Furniture & Equipment for NHAI, PIU-Nanded

NITBid document, BOQ,

1st August  2017 18th July  2017
20 Application for the post of Deputy General Manager (Information Technology) on deputation basis.

Advertisement & Application form,

29th September 2017 17th July  2017
21 Providing the services of 3 Site Engineers,. 2 Stenographers, 2 Office Assistants, 2 poons, 1 Chowkidar & 1 Safaiwala (part time) in the office of Project Director PIU Dwarka, New Delhi.

Bid document

31st July  2017 17th July  2017
22 Hiring of vehicles Innova or equivalent and Indigo/equivalent on monthly basis for PIU Dwarka, New Delhi.

Bid document

31st July  2017 17th July  2017
23 Providing and fixing of traffic sign boards, replacing damaged railing etc., for the stretch of Ichapuram- Narasannapeta section i.e. from km 470.415 to 580.700 (length -110.285 kms) of NH-16 (NH-5), in the state of Andhra Pradesh.

NIT, Bid Vol-I, Bid Vol-II, Price Bid, BOQ, MSME, E-tender Process,

24th July  2017 (On e-Tendering Mode) 17th July  2017
24 Hiring of premises for Office Accommodation for NHAI, PIU- Varanasi.

NIT,

3rd August  2017 17th July  2017
25 Hiring of Vehicle (Yellow Board) on Monthly basis for PIU, Warangal.

Bid document,

28th July  2017 17th July  2017
26 Quotations are invited from the reputed Courier Agencies for PIU- Kolkata.

Bid document,

26th July  2017 17th July  2017
27 Supply of Machinary such as poklen Excavator 200 LC,JCB & Hywa on daily basis for encroachment drive for NH-32 under PIU- Dhanbad.

Bid document, Corrigendum-I

31st July  2017 17th July  2017
28 Short Term Improvement and Routine Maintenance / Special Repairs / Periodical Renewals / Civil Works Contract of Divancheruvu – Gundugolanu Section from Km.901.753 to Km.1022.494 on NH-16 (old NH-5) in the State of Andhra Pradesh.

NIT, RFP, Financial Bid, Infracon Operation Procedure, E-tender Process

8th August  2017 (On e-Tendering Mode) 13th July  2017
29 Short Term Improvement and Routine Maintenance / Special Repairs / Periodical Renewals / Civil Works Contract of (a) Anandapuram- Visakhapatnam - Anakapalli section from Km 682.980 to Km 741.256 (length – 58.276 Kms) of NH-16 (Old - NH-5) (b) Visakhapatnam Port connectivity Project corridor from Km 0.0 to Km 10.336 with main flyover and ramps (length - 12.50 Kms); in the state of Andhra Pradesh.

NIT, RFP, Financial Bid, Infracon Operation Procedure, E-tender Process

8th August  2017 (On e-Tendering Mode) 13th July  2017
30 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS FOR AT DASNA FEE PLAZA AT KM 29.30 IN THE SECTION FROM KM 27.643 TO KM 48.638 & BYPASS 11.250 ON NH-24 (GHAZIABAD HAPUR & HAPUR BYPASS SECTION) IN THE STATE OF UTTAR PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

11th August  2017 (On e-Tendering Mode) 13th July  2017
31 Hiring of Vehicle (AC-Commercial) on monthly rental basis for PIU-Kolhapur (MS)

Bid document

27th July  2017 13th July  2017
32 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KONDER FEE PLAZA AT KM 91.800 ON THE PROJECT OF CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER OF KARAULI TO DHOLPUR SECTION OF NH-11B FROM KM 83.960 TO KM 184.460 (LENGTH 100.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

11th August  2017 (On e-Tendering Mode) 13th July  2017
33 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT CHILA CHOND FEE PLAZA (KM 142.350) ON THE PROJECT OF CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER OF KARAULI TO DHOLPUR SECTION OF NH-11B FROM KM 83.960 TO KM 184.460 (LENGTH 100.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

11th August  2017 (On e-Tendering Mode) 13th July  2017
34 Repair of Sankosh Bridge at Km. 253.200(LHS) of Salsalabari to Assam Bengal Border section of NH-31C in the State of West Bengal.

NITBid Vol-I, Bid Vol-IICorrigendum-I,  

24th July 2017 (On e-Tendering Mode) 13th July  2017
35 Construction of NH-24 4-lane bypass starting from km 479.500 of NH 24 and terminating at km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000 total length 14.618 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode.

  NITRFPDCAIntegrity pactSchedule

14th August  2017 (On e-Tendering Mode) 13th July  2017
36 Appointment of Safety Consultants for Six laning of Ranasthalam – Anandapuram section of NH-16 from Km 634.000 to Km 681.000 in the State of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode (Package-II).

Letter to Bidders, RFP, Form of Financial Proposal, Schedule, Appendix

10th August  2017 (On e-Tendering Mode) 12th July  2017
37 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KM 132.400 AT KUNWARPUR FEE PLAZA FOR THE SECTION FROM KM 86.000 TO KM 166.400 ON NH-231 (NEW NH 31) (RAEBAREILLY JAUNPUR SECTION) IN THE STATE OF UTTAR PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

10th August  2017(On e-Tendering Mode) 11th July  2017
38 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Runni Toll Plaza at Km. 26.090 on Muzzaffarpur-Sonbarsa 2 lane with Paved Shoulder section from Km. 2.800 to Km. 89.00 on NH-77 in the state of Bihar (Annuity Project).

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

10th August  2017(On e-Tendering Mode) 11th July  2017
39 Providing of Security Guard to deploy at the project site of Hoskote-Dobbespet section of NH-207.-  2nd call

NIQ, Corrigendum-I

20th July  2017 10th July  2017
40 Consultancy Services for preparation of Feasibility study / Detailed Project Report for Construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur section from Km 165.400 to Km 190.587 on NH-54 of Package AS-21 (Balance) broadly along the existing DPR alignment in the State of Assam.

RFP,

9th August  2017(On e-Tendering Mode) 7th July  2017
41 Independent Engineer services for Operation and Maintenance of Hyderabad – Bangalore section from Km 211.000 to Km 462.164 of NH-44 (Old NH-7) (Total length 251.164 Km) on OMT Basis in the State of Andhra Pradesh.

NIT, RFP, Infracon ProcedureCorrigendum-I

27th July  2017(On e-Tendering Mode) 7th July  2017
42 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS FOR AT BRAHMARKOTLU FEE PLAZA AT KM 331.290 (UNDER NEW MANGALORE PORT CONNECTIVITY PROJECT) IN THE SECTION OF B.C. ROAD TO PADIL AND PADIL BYPASS FROM KM 328.000 TO KM 345.000 & 1.6 KM OF BYPASS OF NH-48 (NEW NH-73) IN THE STATE OF KARNATAKA.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode) 7th July  2017
43 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT BANTHADI FEE PLAZA AT KM 34.000 FOR TWO LANE WITH PAVED SHOULDERS OF NIMBIJODHA (NEAR LADNU)-DEGANA-MERTA CITY SECTION OF NH-458 (PACKAGE-I) FROM KM 0.000 (EXISTING CHAINAGE KM 0.000) TO KM 139.900 (EXISTING CHAINAGE KM 144.377) (LENGTH 139.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode) 7th July  2017
44 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT TAMDOLI FEE PLAZA AT KM 93.500 FOR TWO LANE WITH PAVED SHOULDERS OF NIMBIJODHA (NEAR LADNU)-DEGANA-MERTA CITY SECTION OF NH-458 (PACKAGE-I) FROM KM 0.000 (EXISTING CHAINAGE KM 0.000) TO KM 139.900 (EXISTING CHAINAGE KM 144.377) (LENGTH 139.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode) 7th July  2017
45 Hiring of Vehicle (Commercial) on Monthly Basis for PIU, Anantapur in Andhra Pradesh.

Bid document

31st July  2017 7th July  2017
46 Consultancy Services for preparation of feasibility report cum Detailed Project Report (DPR) of 4/6 lane (A) Belgaum Bypass (East) tentatively from Km 9.500 (NH 4A) To Km 515.000 (NH 4) (22 Km) and (B) Belgaum Bypass (West) from Km 515.000 (NH 4) to Km 492.000 (NH 4) (New NH 48) (33 Km) in the State of Karnataka.

RFP, Corrigendum-I, Pre-bid meeting,

31st July  2017(On e-Tendering Mode) 7th July  2017
47 Appointment of Safety Consultant for the following projects
1. Two/ Four laning of BRT Tiger Reserve Boundary to Bangalore Section of NH-209 (Existing chainage from Km. 287.520 to Km. 461.550) in the state of Karnataka on Hybrid Annuity mode under NHDP Phase – IV.”
2. Six laning of Chitradurga – Davengere including Chitradurga Bypass (Km.189.000 to Km.260.000 of NH-48 (Old NH-4) in the State of Karnataka to be executed on Hybrid Annuity Mode on DBFOT under NHDP Phase V 
3. Six laning of Davengere – Haveri from Km.260.000 to Km.338.923 of NH-48 (Old NH-4) in the State of Karnataka to be executed on Hybrid Annuity Mode on DBFOT under NHDP Phase V
4. Six laning & Strengthening of Km.340.000 to Km.403.400 of Hubli-Haveri section of NH-48 (Old NH-4) in the State of Karnataka to be executed on Hybrid Annuity Mode on DBFOT under NHDP Phase V

NIT, RFP, Schedule, Policy matterCorrigendum-I,

7th August  2017(On e-Tendering Mode) 6th July  2017
48 Consultancy Services for Preparation of Detailed Project Report of Delhi-Ludhiana- Amritsar- Katra Expressway having an approximate length of 600 Km (the "Project") including spurs through BOT& EPC basis (5th Call)

NIT, RFP, Financial Proposal, Letter to Bidders, DPR Check- List, Revised NIT, Revised RFP, Revised Financial Bid, Revised Letter to Bidders, Corrigendum-I,

8th August  2017(On e-Tendering Mode) 6th July  2017
49 For providing Multitasking Manpower/supporting staff on short term contract basis in the office of Regional Office, Vijayawada.

NIT, Bid document,

19th July  2017 6th July  2017
50 Short Term improvement and Routine Maintenance of Visakhapatnam Port Connectivity Project Corridor from Km 0.00 to Km 10.336 with main flyover and ramps in the State of Andhra Pradesh.

NIT, Bid Vol-I, Bid Vol-II, Price Bid, E-tender process

20th July  2017(On e-Tendering Mode) 6th July  2017
51 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KELWAD TOLL PLAZA AT KM 13.000 (EXISTING CHAINAGE AT KM 74.600) FOR THE SECTION FROM 0.000 TO KM 75.60 (SAONER CHINDWARA SECTION) ON NH-547 IN THE STATE OF MADHYA PRADESH & MAHARASHTRA.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode) 6th July  2017
52 Maintenance/ Improvement of Guwahati Bypass on NH-37 from Jalukbari to Koinadhara (Km 146.172 to Km 163.895) in the state of Assam (Total length 17.723 Km) in 2017.

NIT, Bid Vol-I, Bid Vol-II, Financial Bid, BOQ, Corrigendum-I, Corrigendum-II, E-Tendering Procedure, Corrigendum-III,

3rd August  2017(On e-Tendering Mode) 5th July  2017
53 Consultancy services for Authority’s Engineer for Improvement of T Junction near DhaulaKuan Metro Station including widening of National Highway from DhaulaKuan up to end of Junction on NH-8 and improvement of T Junction near Defence area including widening of National Highway up to Defence area on NH-8 and R&R Hospital Link Underpass on EPC Mode in the State of Delhi.

NIT, RFP, Integrity Pact, Appendix,

8th August  2017(On e-Tendering Mode) 5th July  2017
54 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT NURUDDINPUR FEE PLAZA AT KM 40.000 FOR THE SECTION FROM KM 0.000 TO KM 86.000 (RAEBAREILLY – JAUNPUR SECTION) OF NH-231 (NEW NH-31) IN THE STATE OF UTTAR PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

3rd August  2017(On e-Tendering Mode) 5th July  2017
55 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT SRIRAMPUR FEE PLAZA AT KM 3.588 FOR THE SECTION FROM KM 0.000 TO KM 76.588 (CHANDIKHOL- PARADIP) OF NH-5A IN THE STATE OF ODISHA.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

3rd August  2017(On e-Tendering Mode) 5th July  2017
56 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Balgudar fee plaza located at km 23.500 in the section of Mokama-Munger (Km 1.430 to Km 70.000) on NH-80 in state of Bihar (Annuity Project).

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

4th August  2017(On e-Tendering Mode) 4th July  2017
57 For Supply of IT Equipment for Toll Plazas on National Highways.

Bid document,

10th July 2017 4th July  2017
58 Emergent Repair and rehabilitation work of Telmacho Bridge over river Damodar in Rajganj – Chas section of NH-32 in the State of Jharkhand (2nd Call).

NIT, Bid Vol-I, Bid Vol-II, BOQ,

18th July 2017 (On e-Tendering Mode) 4th July  2017
59 Hiring of Vehicle (Commercial), model of indigo latest model, NHAI RO - Patna

Bid document,

11th July  2017 4th July  2017
60 Providing and Fixing of Solar Blinkers, Marking of Thermoplastic Paint and Sign Boards at the specified locations for the stretch of Ichapuram- Srikakulam- Anandapuram - Visakhapatnam - Anakapalli section i.e. from Km 470.415 to 741.256 (length -270.841 Kms) of NH-16 (NH-5), in the state of Andhrapradesh.

NIT, Bid vol-I, Bid vol-II, BOQ, Financial Bid, E-tender Process,

10th July  2017(On e-Tendering Mode) 4th July  2017
61 TECHNICAL CONSULTANT FOR PREPARATION OF DETAILED PROJECT REPORT INCLUDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF A ROAD TUNNEL WITH ITS APPROACHES INCLUDING JUNCTION WITH DWARKA EXPRESSWAY FOR WESTERN CONNECTIVITY TO IGI AIRPORT FROM DWARKA EXPRESSWAY IN THE STATE OF DELHI.

RFP, Financial Bid, Instruction to Bidders,

7th August  2017(On e-Tendering Mode) 4th July  2017
62 Repairs to Major Bridge at Km: 717.595 by providing Footpath Slabs over Strengthened cantilever Beam on NH-16 (Old NH-5) in the State of Andhra Pradesh (2nd Call)

NIT, Bid vol-I, Bid vol-II, BOQ, Financial Bid, E-tender Process,

6th July  2017(On e-Tendering Mode) 3rd July  2017
63 Providing and Fixing Road Boundary Stones as per IRC:25 for proposed 6-laning of Anakapalli – Anandapuram section of MDR/SH-38 as part of NH-16 (erstwhile NH-5) along with its connectivity with 4/6 lane Visakhapatnam port road in the State of Andhra Pradesh (2nd Call)

NIT, Bid vol-I, Bid vol-II, BOQ, Financial Bid, E-tender Process,

6th July  2017(On e-Tendering Mode) 3rd July  2017
64 Consultancy Services for Appointment of Technical Consultant to Carry out the Detailed Project Report for Upgradation/ Widening of Channrayapattana& Hassan Bypasses, 8 Grade separated Structures, Service Road and other Road Safety Measures essential in Devihalli(Km.110.00) to Hassan(km.189.500) section of NH 75, in the state of Karnataka.

NIT, RFP, Financial Bid-I, Financial Bid-II, Corrigendum-I, Modified Financial Bid-I, Modified Financial Bid-IIPre-bid meeting,

31st July  2017(On e-Tendering Mode) 27th June  2017
65 PROVIDING, RUNNING, & MAINTENANCE OF COMMERCIAL VEHICLES ON MONTHLY HIRE BASIS FOR NHAI, (PIU-KOTA).

NIT, Bid document,

1st August  2017 27th June  2017
66 Print and supply of Medical ID Card of NHAI's employees and their dependents family members.

Notice,

7th July  2017 27th June  2017
67 Consultancy Services for preparation of Detailed Project Report of: 

(i) Construction of Elevated corridor at Sarojini Nagar and Banthara (Km. 14.300 & Km. 23.000) on Lucknow Kanpur Section of NH-25- (Length 4 Kms). 

(ii) Construction of Elevated corridor from Shaheed Path to PGI (Km. 12.700 to Km.16.000) on Lucknow Raebareli Section of NH-24B (length 3.300Kms).

(iii) Construction of Elevated corridor from near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms).

RFP, Corrigendum-I,

10th July  2017(On e-Tendering Mode) 27th June  2017
68 Eastern Peripheral Expressway ITS Installation Project in the state of Uttar Pradesh/ Haryana.

NIT, Bid Vol-I , Bid Vol-II A, Bid vol-II B , Bid vol-III,

22nd August  2017(On e-Tendering Mode) 23rd June  2017
69 Hiring of Vehicles on monthly basis for PIU – Aligarh.

Bid document

18th July 2017 22nd June  2017
70 Consultancy services for Authority Engineer of Rehabilitation and Up-Gradation to 4-Laning of Biramitrapur-Brahmani Bypass end of NH-23 (New NH No. 143) Km 211.200-Km 237.100 & from Km 0.000-Km 3.200 (Brahmani By-Pass) i.e. upto Km 240.100 (Package I-A) and Km. 240.250 i.e. Brahmani By-Pass End Beside BNR Weigh Bridge to Km. 287.200 i.e. Rajamunda Section on NH-23 in the State of Odisha under NHDP IV, Package I-B.

NIT, RFP , Financial Bid   

7th August  2017(On e-Tendering Mode) 22nd June  2017
71 Engagement of Security/Placement Agency for supply of Manpower/supprot staff on short term contract basis in the piu office at Bundi

NITBid document

17th July  2017 22nd June  2017
72 Expression of Interest (EOI) for engaging Advertising agency to promote FASTag sales for NETC awareness campaign and lead generation.

EOI

7th July  2017 22nd June  2017
73 RFP for Four Laning of Solan Kaithlighat Section of NH-22 (Now NH-5) from km 106.139 to km 129.05 under NHDP Phase-III in the State of Himachal Pradesh on EPC mode.

NIT, RFP , E-tender Process   

7th August  2017(On e-Tendering Mode) 22nd June  2017
74 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT AGANAMPUDI TOLL PLAZA AT KM 728.055 FROM KM 2.837–KM 0.00 & KM 395.870–KM 358.00 (NEW CHAINAGE FROM KM 700.544–KM 741.255) OF VISHAKHAPATNAM – ANKAPALLI SECTION OF NH-5 IN THE STATE OF ANDHRA PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

19th July  2017(On e-Tendering Mode) 20th June  2017
75 Hiring of Commercial Vehicles on monthly basis for PIU-Meerut.

Bid document, Corrigendum-I,

17th July  2017 20th June  2017
76 Supplying / Security agencies for providing Multitasking Manpower/supporting staff on short term contract basis in the office of Regional Office, Vijayawada.

NIT, Bid document, Annexures,

3rd July  2017 20th June  2017
77 Supply of Vehicles at NHAI, PIU Ambala on monthly hire basis.

Bid document, Corrigendum-I

30th June  2017 19th June  2017
78 Widening of Brahmarakotlu Toll Plaza from existing 2+2 lanes to 3+3 lanes with staggered arrangements with necessary Civil Works for ETC lane at Km. 331.290 of NH-48 under New Mangalore Port Road Connectivity.

NIT, Bid vol-I, Bid Vol-II, Financial Bid, Corrigendum-I

31st July  2017(On e-Tendering Mode) 19th June  2017
79 PROVISION OF CONTROL CENTRE SERVICES FOR TRAFFIC SURVEY ON HIGHWAYS

RFP, Corrigendum-I,  Reply to Queries, Corrigendum-II,

25th July  2017 19th June  2017
80 Independent Engineer services for Operation & Maintenance Period of Six Laning of NH-47 from km 102.035 to km 144.680 on Chengapalli to start of Coimbatore Bypass and Four laning from km 170.880 to km 183.010 from end of Coimbatore Bypass to TN/Kerala Border Section of NH-47 In the State of Tamil Nadu under NHDP Phase-II on DBFOT (Toll) Basis.

NIT, RFP,

29th June  2017(On e-Tendering Mode) 19th June  2017
81 Supply, Installation and Commissioning of Networking, Server, Storage, Security and Wi-Fi systems at NATIONAL HIGHWAYS AUTHORITY OF INDIA

RFP, Pre Bid Reply/ Corrigendum-I, Corrigendum-II,

31st July  2017(On e-Tendering Mode) 16th June  2017
82 Maintenance of existing carriageway and essential safety measures of proposed four laning of Hoskote - Dobbaspet Section of NH207 from Km. 58+300 to Km. 138+320 in the State of Karnataka - at the Risk and Cost of the Concessionaire M/s Transstroy Hoskote Dobbaspet Tollways Pvt. Ltd.

NIT, Bid Vol-I, Bid Vol-II, Fiancial Bid, BOQ

6th July  2017(On e-Tendering Mode) 16th June  2017
83 Emergent Repair & Rehabilitation of Sindh Bridge at Km. 54.300, Gwalior-Jhansi section of NH-75 in the State of Madhya Pradesh.

Bid Vol-I, Bid Vol-II,

13th July  2017(On e-Tendering Mode) 16th June  2017
84 Two lanes with paved shoulders of Tindivanam-Krishnagiri section of NH-66 from Km 37.600 to Km 219.782 (Design Chainage) – DBFOT (Annuity) basis – Under NHDP Phase-III in the State of Tamil Nadu – Estimate for Partially completed locations and diversion stretches from Km 147.000 to Km 219.782. Package no:ROChennai/2017 - 18/Civilworks/05)

Bid document,

27th June  2017(On e-Tendering Mode) 16th June  2017
85 Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh.

Bid document, Financial Bid, Amendment-I, Revised RFP,

13th July  2017(On e-Tendering Mode) 15th June  2017
86 Repair & Maintenance work of Gwalior-Jhansi section of NH-75 from Km. 16.00 to Km. 96.127 in the state of Madhya Pradesh and Uttar Pradesh 

Bid Vol-I, Bid Vol-II, BOQ

13th July  2017(On e-Tendering Mode) 15th June  2017
87 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT VEMAPADU FEE PLAZA AT KM 795.498 FOR THE SECTION FROM KM 358.00 – KM 272.00 (NEW CHAINAGE FROM KM 830.525 – KM 741.255) ANKAPALLI – TUNI OF NH-5 IN THE STATE OF ANDHRA PRADESH

NIT, RFP, Financial BidPolicy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

17th July  2017(On e-Tendering Mode) 15th June  2017
88 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT PULLUR FEE PLAZA AT KM 200.950 FOR THE SECTION FROM KM 135.469–KM 211.00 (KOTHAKOTA BYPASS–KURNOOL SECTION) OF NH-7 IN THE STATE OF TELANGANA

NIT, RFP, Financial BidPolicy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

13th July  2017(On e-Tendering Mode) 15th June  2017
89 Procurement & Installation of Office Furniture, Fixture, Equipments & Ancillary items for NHAI, PIU-Tirupati.

Bid document, Annexure-A,

29th June  2017 15th June  2017
90 Supply of Commercial Vehicle at NHAI, PIU, Dhanbad on monthly rental basis (2nd Call)

Bid document,

30th June  2017 15th June  2017
91 Consultancy Services for preparation of Feasibility Study/Detailed Project Report for Construction of new 4-lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Phase VII – 2nd Call

RFP,

5th July  2017(On e-Tendering Mode) 14th June  2017
92 For providing Manpower / supporting staff on short term contract in the office at NHAI, PIU Moradabad.

NIQ, Bid document, Annexure,

27th June  2017 14th June  2017
93 Providing of Supporting Staff on Purely Temporary Basis for PIU, Dhamtari (CG).

Bid document,

29th June  2017 14th June  2017
94 Consultancy Services for feasibility study and preparation of detailed project report for 4 laning of Basukinath - Deoghar section of NH-114A under NHDP Phase-IV in the state of Jharkhand.

RFP, Infracon, Integrity Pact, Corrigendum-I,

25th July  2017(On e-Tendering Mode) 13th June  2017
95 Bids for organizing NHAI Exhibition at ‘Govt. Achievements and Schemes Expo-2017’ to be held at Pragati Maidan from 14-16 July 2017

Bid document,

28th June  2017(On e-Tendering Mode) 13th June  2017
96 Office Accommodation on rent for NHAI, Site Office Pali under PIU-Jodhpur

NITBid document

27th June  2017 13th June  2017
97 AUCTION OF PLANT / EQUIPMENTS / MACHINERIES, SHUTTERING, SCAFFOLDINGS, PRECAST ELEMENTS, MISCELLANEOUS ITEMS LYING AT NEAR KM. 9.4 (RHS) (TRANCHE-1 TO 7) ALONG LUCKNOW BYPASS WHICH HAS BECOME THE DEEMED PROPERTY OF THE SELLER ON THE TERMINATION OF THE CIVIL WORK CONTRACT NHAI-PIU-LUCKNOW

NITBid documentAnnexureList of Plant & Machineries

5th July  2017 13th June  2017
98 Application for the post of Chief General Manager (Utility Shifting) on deputation basis.

Advertisement & Application form

31st July  2017 13th June  2017
99 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING THROUGH E-TENDER BASIS ONLY VISAKHAPATNAM PORT CONNECTIVITY TOLL PLAZAS LOCATED AT KM 9.158 (MAIN TOLL PLAZA NEAR PANCHAVATI COLONY) AND AT KM 2.262 (SECONDARY TOLL PLAZA NEAR GOSTHANI GATE OF NAVY) FOR THE SECTION FROM KM 0.000 TO KM 10.336 (VISAKHAPATNAM PORT CONNECTIVITY) IN THE STATE OF ANDHRA PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

12th July  2017(On e-Tendering Mode) 13th June  2017
100 Empanelment/re-empanelment of Financial Consultants for BOT (Toll)/BOT (Annuity), Hybrid Annuity and other projects being undertaken by NHAI.

RFP, Letter for Extension of EOI/Bid due date, Corrigendum-I, Reply to Pre-bid Queries

21st July  2017 12th June  2017
101 Emergent Repair and rehabilitation work of Telmacho Bridge over river Damodar in Rajganj – Chas section of NH-32 in the State of Jharkhand.

NIT, Bid Vol-I, Bid Vol-II,

27th June  2017(On e-Tendering Mode) 9th June  2017
102 Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of construction of 4 Lane Inner Ring Road in and around Allahabad City in the state of Uttar Pradesh.

  RFP, Financial Bid, Revised RFP, Letter to Bidders, Map,

20th July 2017 (On e-Tendering Mode) 7th June  2017
103 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT AKHEPURA FEE PLAZA LOCATED AT KM 324.638 FOR FOUR LANING OF REENGUS TO SIKAR SECTION FROM KM 298.075 NEAR MADHOPURA JUNCTION TO KM 341.047 (AFTER SIKAR TOWN) ON NH-11 (PROPOSED CHAINAGE 298.075 TO KM 341.962) IN THE STATE OF RAJASTHAN ON BOT (ANNUITY) PROJECT UNDER NHDP PHASE – III.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

6th July 2017 (On e-Tendering Mode) 7th June  2017
104 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT PATANSAWANGI FEE PLAZA LOCATED AT KM 25.700 FOR NAGPUR-SAONER-BETUL SECTION OF NH-69 FROM KM 3.000 TO KM 59.300 IN THE STATE OF MAHARASHTRA AND FROM KM 137.000 TO KM 257.400 IN THE STATE OF MADHYA PRADESH ON DBFOT (ANNUITY) BASIS.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

6th July 2017 (On e-Tendering Mode) 7th June  2017
105 Consultancy Services for Authority’s Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt – Saharsa - Purnea section of NH 107 from km. 0.000 to km. 90.000 in the State of Bihar on EPC Mode (Package-I).

NIT, RFPAddendum-IAddendum-II

2nd August 2017 (On e-Tendering Mode) 7th June  2017
106 Consultancy Services for Authority’s Engineer for Supervision of Construction of Service Road (Length-32.00 km) with RCC drain with cover between main carriageway and proposed Service Road on both sides, Drain Cover of length 50.23 km and Streetlight on Service Road of length 10.560 km (both sides) in the project of 6-lanning of Indore-Dewas Section of NH-3 from km 577.550 to km 610.199 and km 0.000 to km 12.600 (Approx. length 45.05 km) in the State of Madhya Pradesh under NHDP Phase-V to be executed on EPC mode.

NIT, Bid document,

5th July 2017 (On e-Tendering Mode) 6th June  2017
107 Consultancy Services for Authority’s Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt – Saharsa - Purnea section of NH 107 from km. 90.000 to km. 177.960 in the State of Bihar on EPC Mode (Package-II).

NIT, Bid document, Addendum-I

18th July 2017 (On e-Tendering Mode) 6th June  2017
108 Appointment of firm/agency for Joint Measurement Survey, Valuation of affected structures falling within ROW and Supply & Fixing of Boundary Pillars for 6-laning of Hapur Bypass to Moradabad Section including Hapur Bypass from Km 50.00 to Km 149.250 of NH-24 in the State of Uttar Pradesh. 

NIT, Bid document, Corrigendum-I, Revised Amended NIQ,

27th June 2017  5th June  2017
109 Periodic Renewal by resurfacing and other safety devices for Two Lane Chenani- Nashri stretch (old alignment) from Km 89.00 to Km 130.00 of NH-44 in the State of Jammu and Kashmir (2nd Call)

NITRFP, BOQE-tender Process, Corrigendum-I

11th July 2017 (On e-Tendering Mode) 2nd June  2017
110 Office accommodation measuring about 2500 sq. ft. carpet area in Kota City with adequate parking facility on “long leave & license basis.

NITBid document,

5th July  2017 1st June  2017
111 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT MANOHARABAD FEE PLAZA AT 443.713 FOR THE STRETCH FROM KM 419.793 TO KM 481.331 (CHEGUNTA – BEWENPALLY SECTION) OF NH-7 IN THE STATE OF TELANGANA

NITRFPPolicy CircularAmendment RFP RFQLetter to Toll ContractorFinancial BidBus and Truck Bifurcation,

29th June 2017 (On e-Tendering Mode) 1st June  201477
112 Appointment of Concurrent Auditor for Four laning of Krishnagar-Baharampore Section of NH-34 from Km 115.000 to Km 193.000 in the state of West Bengal under NHDP Phase-III on DBFOT (Annuity) Basis (Package No. NHDP- III/BOT/WB/02)

NIQAnnexure-AAnnexure-BAnnexure-CAnnexure-DCorrigendum-I, Corrigendum-II, Corrigendum-IIICorrigendum-IV

28th July 2017 1st June  2017
113 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KM 85.280 FOR VIGHAKHET FEE PLAZA FOR THE SECTION FROM KM 49.700 TO KM 99.005 (JHANSI - LALITPUR SECTION) OF NATIONAL HIGHWAYS NO. 26 IN THE STATE OF UTTAR PRADESH.

NITRFPPolicy CircularAmendment RFP RFQLetter to Toll ContractorFinancial BidBus and Truck Bifurcation,

29th June 2017 (On e-Tendering Mode) 31st May  2017
114 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF FOUR LANE ODDANCHATRAM BYPASS FROM KM 23.230 TO KM 30.900 OF NH – 209 (NEW NH NO. 83), (DESIGN CHAINGAE FROM KM. 23.100 TO KM. 33.200) UNDER NHDP – IV, IN THE STATE OF TAMIL NADU, ON EPC MODE. 

NITRFPFinancial ProposalIntegrity pactExtension of Bid due date,

10th August 2017 (On e-Tendering Mode) 29th May  2017
115 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS FOR SURATHKAL FEE PLAZA AT KM 358.042 (NITK), ON SURATHKAL – NANTOOR SECTION FROM KM 358.800 TO KM 375.300 AND 1.6 KM OF NANTOOR BYPASS (LENGTH 18.362 KM) OF NH-17 (NEW NH-66) IN THE STATE OF KARNATAKA.

NITRFPPolicy CircularAmendment RFP RFQLetter to Toll ContractorFinancial BidBus and Truck Bifurcation, Addendum-I

29th June 2017 (On e-Tendering Mode) 31st May  2017
116 TRAFFIC SURVEY ON NATIONAL HIGHWAYS USING PORTABLE AUTOMATIC TRAFFIC COUNTER & CLASSIFIER (ATCC) SYSTEMS

Bid document, Corrigendum-I, Corrigendum-II, Clarifications to Bidders queriesCorrigendum-III, Corrigendum-IV

10th July 2017 31st May  2017
117 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT PANIKHOLI FEE PLAZA AT KM 88.435 (KM 191.698 NEW) FOR THE SECTION FROM KM 62.000 TO KM 136.500 (NEW CHAINAGE KM 218.000 – KM 143.500) CHANDIKHOLE-BHADRAK OF NH-5 IN THE STATE OF ODISHA.

NITRFPPolicy CircularAmendment RFP RFQLetter to Toll ContractorFinancial BidBus and Truck Bifurcation,

29th June 2017 (On e-Tendering Mode) 31st May  2017
118 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KM 229.913 AT USAKA (CHAMARI) TOLL PLAZA FOR THE SECTION FROM KM 225.713 TO KM 288.513 ON NH-25 (BARA TO ORAI SECTION) IN THE STATE OF UTTAR PRADESH.

NITRFPPolicy CircularAmendment RFP RFQLetter to Toll ContractorFinancial BidBus and Truck Bifurcation,

28th June 2017 (On e-Tendering Mode) 30th May  2017
119 Construction of Four Lane Flyover/ Grade Separator at Km. 80.742 [from Km 79.780 to 81.200 (design chainage 0.530 to 1.950-length 1.420 Km)] of NH-3 at Morena Town to be executed on EPC mode in the state of Madhya Pradesh. 

NITRFPE-tender ProcessTechnical ScheduleNon-Technical Schedule,

11th July 2017 (On e-Tendering Mode) 29th May  2017
120 Supervision Consultancy Services for construction supervision of Balance work of Rehabilitation and upgradation to four lanes from Km. 16 to Km. 96.127 of Gwalior - Jhansi Section of NH-75 in the State of UP and MP under North-South Corridor (NHDP Phase-II) on EPC Mode(Item Rate Basis)

NITRFP

29th June 2017 (On e-Tendering Mode) 29th May  2017
121 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS for Ghanghri at Km 346.100 (Gorhar to BarwaAdda) from Km 320.00 - Km 398.750 of National Highway no.-2, in the State of Jharkhand.

NITRFPPolicy CircularAmendment RFP RFQLetter to Toll ContractorFinancial BidCircular

27th June 2017 (On e-Tendering Mode) 29th May  2017
122 Short Term improvement and Routine Maintenance of Visakhapatnam Port Connectivity Project Corridor from Km 0.00 to Km 10.336 with main flyover and ramps in the State of Andhra Pradesh

 Bid document-Vol-I, Bid document-Vol-IIE-Tendering Process, Corrigendum-I,

28th June 2017 (On e-Tendering Mode) 26th May  2017
123 Construction of Grade separator from H-7 area to Port Connectivity Road bypassing convent Junction in the state of Andhra Pradesh on Engineering, Procurement & Construction (EPC) Mode

NIT, RFP,   E-Tendering Process,   Model EPC Agreement, Corrigendum-I, Corrigendum-II

31st July 2017 (On e-Tendering Mode) 26th May  2017
124 Independent Engineer services during Operation & Maintenance Period for the project of 6-laning of Chandikhole-Jagatpur-Bhubaneswar section of NH-16 from Km. 413.000-418.000 and Km. 0.000 to Km. 62.000 as BOT (Toll) on DBFOT Pattern under NHDP-Phase-V in the State of Odisha.

NIT, RFP

21st June 2017 (On e-Tendering Mode) 25th May  2017
125 Expressions of Interest (EOI) from eligible firms for providing “Web Radio Services on Delhi-Mumbai Stretch as Pilot Project”

EOI,

27th June 2017  25th May  2017
126 Engagement of Security/Placement Agency for supply of employees on contract basis in the office of Project Director, PIU-Purnea.

Bid document, Corrigendum-I, Corrigendum-II,

27th June  2017 24th May  2017
127 Recruitment of Deputy Manager (Technical) on Direct Recruitment basis.

Advertisement, Apply OnlineCorrigendum,

31.07.2017 24th May  2017
128 Independent Engineer services for Four Laning of Solapur- Bijapur Section of NH-13 (NEW NH NO 52)(Four Lane) from km 0.000 to km 110.542 (Design Length 109.08 km) in the states of Maharashtra and Karnataka to be executed under BOT (Toll) on Design, Build, Finance, Operate and Transfer (DBFOT) basis" under NHDP Phase III Project

NIT, RFP, Infracon Operation Procedure, Corrigendum-I, Pre-bid ReplyCorrigendum-II, Corrigendum-III,

17th July 2017 (On e-Tendering Mode) 23rd May  2017
129 Construction of 4 Lane Oddanchathram Bypass from Km. 23.230 to Km. 30.900 of NH-209 (new NH No. 83), (Design chainage from Km. 23.100 to Km. 33.200) under NHDP-IV, in the State of Tamil Nadu on EPC Mode.

NIT, RFP, EPC Agreement, RFP, E-Tendering, Extension of Bid due date, Corrigendum-II, Corrigendum-III,

1st August 2017 (On e-Tendering Mode) 18th May  2017
130 Consultancy Services for preparation of Feasibility study /Detailed Project Report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH – 54 of package AS-21(Bal) through New Alignment in the State of Assam on EPC mode.

RFP, E-tender process, Corrigendum-IV,

17th July 2017 (On e-Tendering Mode) 18th May  2017
131 Construction and Operation of Wayside Amenities at km 353+542 (LHS) (old km 348+345), Gorakhpur to Salemgarh of NH 28, Tamakuhi Raj, Kushinagar dist., Uttar Pradesh under BOT Mode (Build, Operate, Transfer) (Package No: WSA/UP/Phase 1/NH 27/195)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report,Site data Report , Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 18th May  2017
132 Construction and Operation of Wayside Amenities atkm 355+202 (RHS) (old km 350+330), Gorakhpur to Salemgarh of NH-28, Tamakuhi Raj, Kushinagar dist., Uttar Pradeshunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/UP/Phase 1/NH 27/196)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 18th May  2017
133 Construction and Operation of Wayside Amenities atKm 304+600 (RHS) Tirupathi - Tiruthani - Chennai Section of NH 205, S V Puram Village, Vadamalaipetta, Chitoor Dist, Andhra Pradesh under BOT Mode (Build, Operate, Transfer) (Package No: WSA/AP/Phase 1/NH 716/270)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 18th May  2017
134 Construction and Operation of Wayside Amenities at km 29-30 (LHS) of NH-11, Jaipur-Agra Section, Sunari, near Bharatpur, Rajasthan under BOT Mode (Build, Operate, Transfer) (Package No: WSA/RJ/Phase 1/NH 21/347)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 18th May  2017
135 Construction and Operation of Wayside Amenities atkm 47+100 (LHS) of Hosur - Krishnagiri Section of NH 7, Perandapalli, Krishnagiri, Tamil Nadu under BOT Mode (Build, Operate, Transfer) (Package No: WSA/TN/Phase 1/NH 44/351)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 18th May  2017
136 Independent Engineer services during balance construction period and O&M period for Four laning of Gwalior-Shivpuri section of NH-3 from km 15.600 of NH-75 (End of Gwalior bypass) to km 236.00 of NH-3 in the state of Madhya Pradesh on BOT (Toll) on DBFOT Pattern under NHDP Phase-IV.-  (2nd call)

RFPCorrigendum-ICorrigendum-II, Addendum-IAddendum & Corrigendum-III, Revised BOQ,

24th July 2017  (On e-Tendering Mode) 17th May  2017
137 Improvement of T Junction near Dhaula Kuan Metro Station including widening of National Highway from Dhaula Kuan up to end of Junction on NH-8 and improvement of T Junction near Defence area including widening of National Highway up to Defence area on NH-8 and R&R Hospital Link Underpass on EPC Mode in the State of Delhi.

NIT, RFP, Schedule, EPC Agreement, E-tender Process, DrawingsPre-bid reply to QueriesCorrigendum-ICorrigendum-IICorrigendum-IIICorrigendum-IV, Corrigendum-V,

2nd August 2017 (On e-Tendering Mode) 17th May  2017
138 Request for Annual Pre-Qualification (RFAQ) - 2017 for the works to be taken up on EPC mode during 2017-18

NIQ, RFAQ, Corrigendum-I,

17th August 2017 (On e-Tendering Mode) 15th May  2017
139 Consultancy Services for preparation of Feasibility Study/Detailed Project Report for Construction of new 4-lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Phase VII

RFP, Revised RFP,

6th June 2017 (On e-Tendering Mode) 15th May  2017
140 Consultancy Services for preparation of Detailed Project Report of stretches from Ankaleshwar (Km.0.000) to Netrang (Km.45.000) & Taloda (Km.143.000) to Burhanpur (Km.543.000) of National Highways for up gradation to 4- lane in the State of Maharashtra.

NITRFP, Financial BidReply to pre-bid Queries,

27th June 2017 (On e-Tendering Mode) 15th May  2017
141 CONSTRUCTION OF TWO LANE ROB (PIMPALKUTTI ROB) INCLUDING APPROACHES AT KM.173.522 OF NAGPUR -HYDERABAD OF NH- 44 (Old NH-7) IN THE STATE OF MAHARASHTRA– PACKAGE NO.NS-62-A(MH)-BAL.

NITFinancial Bid, Schedule, EPC Agreement, GADReply to pre-bid Queries,

27th June 2017 (On e-Tendering Mode) 15th May  2017
142 Construction and Operation of Wayside Amenities at km 187+700(RHS) of NH-544 (old NH-47) of Walayar - Vadakkanchery Section, Vattapara, Pudussery East Village, Near Walayar Police Station, Palakkad Dist, Kerala under BOT Mode (Build, Operate, Transfer) (Package No: WSA/KL/Phase 1/NH 544/259)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 15th May  2017
143 Construction and Operation of Wayside Amenities atkm 211+000, RHS of Forbesganj - Simrahi Section of NH 57, Dodra Village, Chattapur Tehsil, Supaul dist., Bihar under BOT Mode (Build, Operate, Transfer) (Package No: WSA/BR/Phase 1/NH 27/232)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 15th May  2017
144 Construction and Operation of Wayside Amenities atkm 209+100 LHS of Forbesganj to Simrahi section of NH-57, Garhia village, Pratapganj Tehsil, Supaul dist., Bihar under BOT Mode (Build, Operate, Transfer) (Package No: WSA/BR/Phase 1/NH 27/231)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 15th May  2017
145 Construction and Operation of Wayside Amenities atkm 63+300 (RHS) of NH-3 of Indore - Khalghat Section, Lodhipur village, Dharampuri Tehsil, Dhar District, Madhya Pradeshunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/MP/Phase 1/NH 52/31)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 15th May  2017
146 Construction and Operation of Wayside Amenities atKm 15+550 (LHS) of NH-3, Indore - Khalghat Section, PithampurChaupati village, Pithampur Tehsil, Dhar District, Madhya Pradeshunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/MP/Phase 1/NH 52/28)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV,

21st August 2017 (On e-Tendering Mode) 15th May  2017
147 ADDITIONAL FACILITATES FOR 4-LANE DIVIDED HIGHWAY OF KM. 52.250 TO KM. 130.560 OF NH-58 (MEERUT-MUZZAFFARNAGAR SECTION) IN THE STATE OF UTTAR PRADESH ON EPC MODE.

NIT, RFP, DCA, Schedule, Drawing, E-tender ProcessAmendment-I

1st August 2017 (On e-Tendering Mode) 11th May  2017
148 Consultancy Services for preparation of Feasibility Study/Detailed Project Report for JNPT-Package-V consisting:-
1) Navi Mumbai International Airport interchange on East side (Amra Marg/NH-348A) at Ch.2.860 (Approx.) of Amra Marg.
2) Navi Mumbai International Airport Interchange on West side (NH-4B D-G Section) at Ch.2.850 (Approx.)
3) Interchange at Kille Junction (Link from Palm Beach road to Amra Marg towards Navi Mumbai International Airport /Gavhan Phata) – Free Right.
4) Connecting links from Navi Mumbai International Airport /NH-4B D-G Section to Sion Panvel Highway & Mumbai Pune E-way &
a. Connecting links from Sion Panvel Highway to Airport/NH-4B D-G section.
b. Connecting link to & from Mumbai Pune E-way to Airport/NH-4B D-G Section
5) VUP at Ch 3.380 (Approx.) of size 2x15 m to be introduced for airport exit on west side.
6) VUP at Ch 4.093 (Approx.) of size 1x60 m to be introduced for traffic from 60m wide South road of Navi Mumbai International Airport /Non Aero area.
7) Extension of RUB and related loops at Km 23 of D-E section of NH-4B

RFP,

27th June 2017 (On e-Tendering Mode) 11th May  2017
149 Six Laning of Pimplgaon-Nashik-Gonde Section of NH-03 from Km 380.000 to Km 440.000 in the state of Maharashtra - Balance / Additional Works on EPC Mode.

RFPFinancial BidEPCExecutive SummarySchedules, Pre-bid Queries Reply, Geotechnical reports, Corrigendum-I , Corrigendum-III

1st August 2017 (On e-Tendering Mode) 11th May  2017
150 Construction of Integrated Structures along with development of other allied structures on both sides of Chandani Chowk junction (Ch. 842.580) of NH-4 in Pune City in the state of Maharashtra on EPC mode.

NIT, RFP, Financial Bid, EPC, Schedules, E-Tender processCorrigendum-ICorrigendum-II,

21st July 2017 (On e-Tendering Mode) 9th May  2017
151 Construction and Operation of Wayside Amenities at Km 124+030 (RHS) of NH-7, Madurai to Kanniyakumari Section, Vadaku lIlandhaikulam Village Road, Near Salaipudur Toll, Thoothukudi Dist., Tamil Nadu under BOT Mode (Build, Operate, Transfer) (Package No: WSA/TN/Phase 1/NH 44/350)

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IV,

10th August  2017 (On e-Tendering Mode) 4th May  2017
152 Construction and Operation of Wayside Amenities at km 29-30 (RHS) of NH-11, Jaipur-Agra Section, Sunari, near Bharatpur, Rajasthan under BOT Mode (Build, Operate, Transfer) (Package No: WSA/RJ/Phase 1/NH 21/348)

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-IDrawingsAmendment-I, Corrigendum-IV,

10th August  2017 (On e-Tendering Mode) 4th May  2017
153 Construction and Operation of Wayside Amenities atkm 365+360 (LHS) of NH-63, Bellary - Guntakal Section, Paramadevanahalli Village, Bellary Taluk, Bellary Dist., Karnatakaunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/KA/Phase 1/NH 67/310)

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IV,

10th August  2017 (On e-Tendering Mode) 4th May  2017
154 Construction and Operation of Wayside Amenities atkm 186+500(LHS) of NH-544 (old NH-47) of Walayar - Vadakkanchery Section, Vattapara, Pudussery East Village, Near Walayar Police Station, Palakkad Dist, Kerala under BOT Mode.

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IV,

10th August  2017 (On e-Tendering Mode) 4th May  2017
155 Construction and Operation of Wayside Amenities at Km 15+550 (RHS) of NH-3, Indore - Khalghat Section, PithampurChaupati village, Pithampur Tehsil, Dhar District, Madhya Pradesh under BOT Mode (Build, Operate, Transfer) (Package No: WSA/MP/Phase 1/NH 52/29).

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IV,

10th August  2017 (On e-Tendering Mode) 4th May  2017
156 Four/Six Laning of Solapur – Bijapur of NH-13 (New NH no 52) from km 0.0 to 110.542 (Design length 109.08 km) in the State of Maharashtra and Karnataka to be executed as BOT (Toll) Project on DBFOT Pattern under NHDP Phase-III.

NIT, RFP, DCA, Schedules, E-tenders Procedure, Pre-bid Reply & Corrigendum-I, DPR Plan & Profile, Schedules & GADPre-bid Query & Corrigendum-II, Addendum-I,

17th  July 2017 (On e-Tendering Mode) 3rd May  2017
157 INDEPENDENT ENGINEER SERVICES FOR OPERATION AND MAINTENANCE OF Operation and Maintenance of four laned Jalandhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A IN THE STATE OF PUNJAB ON OMT BASIS (PACKAGE – OMT -21A).

RFP, Financial Bid, Infracon Operation Procedure, Integrity Pact Format, Amendment-I, Amendment-II, Amendment-III,

25th July 2017 (On e-Tendering Mode) 27th April  2017
158 Construction and Operation of Wayside Amenities at km 741+600 (RHS) of NH-4, Pune-Satara Section, Varye village, Satara Taluk, Satara district, Maharashtra under BOT Mode (Build, Operate, Transfer).

Bid Vol-I, Bid Vol-II, Financial Bid, Site Feasibility Report, Corrigendum-I, Drawings of wayside amenities, Corrigendum-II, Corrigendum-III, Corrigendum-IV,

30th July 2017 (On e-Tendering Mode) 25th April  2017
159 Four Laning of Sethiyahopu – Cholopuram from km 65.960 to km 116.440 section of NH-45C in the state of Tamilnadu under NHDP Phase-IV on Hybrid Annuity Mode.

NIT, RFP, Financial Bid, DCA, Schedules, Executive summaryGADs, Plan & ProfileExtension of Bid due date, Extension of Bid due date, Corrigendum-IVBid due date extension,

18th July 2017  (On e-Tendering Mode) 19th April  2017
160 Consultancy Services for Independent Engineer services for Six Laning of Bangalore – Nidigatta Section, Km 18+000 to Km 74+200 of NH-275 in state of Karnataka to be executed on Hybrid Annuity Mode.

NIT, RFP, Financial BidLetter to Bidders, Corrigendum-I & pre-bid Reply, Corrigendum-II, Corrigendum-III,

18th July 2017  (On e-Tendering Mode) 18th April  2017
161 Consultancy Services for Independent Engineer services for Six Laning of Nidagatta-Mysore Section, km 74.20 to km 135.304 of NH-275 in the State of Karnataka to be executed on Hybrid Annuity Mode.

NIT, RFP, Financial Bid, Letter to Bidders, Corrigendum-I & pre-bid Reply, Corrigendum-II, Corrigendum-III,

18th July 2017  (On e-Tendering Mode) 18th April  2017
162 Authority’s Engineer for Supervision of Construction of Stand alone Ring Road / Bypass around Jammu City in the state of J&K (4 Lane, Length -58.2Km) on Engineering Procurement and Construction (EPC) Basis.

NITRFP, Letter to bidders, Corrigendum-I, Corrigendum-II, Reply to pre-bid Queries, Corrigendum-III,

17th August 2017  (On e-Tendering Mode) 13th April  2017
163 Independent Engineer Services for Four laning of End of Pandoh bypass to Takoli Section of NH-21 (Km 221.305 to Km 242.000) (Design Length-18.908 Km) on Hybrid Annuity Mode in the state of Himachal Pradesh under NHDP-IVB-Package-II.

NITRFP, Letter to biddersReply to Queries, Corrigendum-ICorrigendum-IICorrigendum-III, Corrigendum-IV

25th July 2017 (On e-Tendering Mode) 13th April  2017
164 Construction of Grade Separator Structure at Khandagiri Chowk (Km. 412) on NH-5 (New NH-16) in the State of Odisha on EPC mode.

RFP, EPC AgreementSchedule, DrawingE-tender process, Reply to pre-bid QueriesRevised E-tender ProcedureAddendum-ICorrigendum-ICorrigendum-II,

22nd June 2017  (On e-Tendering Mode) 13th April  2017
165 Independent Engineer services for Operation and Maintenance of Ayodhya-Gorakhpur Section Border stretch of NH-28 in the State Uttar Pradesh (OMT Pkg-11) on OMT basis.

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-IIICorrigendum-IVReply to pre-bid QueriesRevised RFP Vol-IRevised RFP Vol-IICorrigendum-V, Corrigendum-VI, Revised Bid document,

17th August 2017  (On e-Tendering Mode) 13th April  2017
166 Independent Engineer services for Operation and Maintenance of Gorakhpur-Kasia- UP/Bihar border section of NH-228 from km. 279.800 to km. 360.915 (new ch. Km. 285.002 to km. 366.117) (Total Length = 81.115 km.) on OMT basis toll collection of Toll Plaza at km. 255.200 (New ch. Km 256.500) (For Toll collection of BOT Annuity reach from km. 251.700 to km. 279.800 (new Ch. km. 252.860 to km. 285.215) of Gorakhpur Bypass of NH-28 in the state of Uttar Pradesh on OMT basis. 

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-VCorrigendum-VI, Revised Bid document,

17th August 2017  (On e-Tendering Mode) 13th April  2017
167 Independent Engineer services for Operation & Maintenance of Allahabad Bypass (including Ganga Bridge Pkg. ABP-1) from Km. 158.00 to Km. 242.708 section of NH-2 in the State of U.P under OMT Pkg. 32.

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-VCorrigendum-VI, Revised Bid document,

17th August 2017  (On e-Tendering Mode) 13th April  2017
168 Independent Engineer services for Operation & Maintenance of Kanpur-Lucknow (Km. 11.005 to Km. 75.500) stretch of NH-25 and Lucknow Bypass (Km. 0.00 to 22.850) stretch of NH-56A & 56B and Lucknow-Ayodhya Section (Km. 8.00 to km 137.970) stretch of NH-28 (Total length km 217.315) in the state of U.P. under OMT basis.

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV,  Corrigendum-VCorrigendum-VI, Revised Bid document,

17th August 2017  (On e-Tendering Mode) 13th April  2017
169 Command and Control Centre including Video Conference, CCTV Surveillance & Monitoring of Vehicular Congestion on National Highway Toll Plazas.

NITRFPCorrigendum-I, Corrigendum-II, Revised RFP, Corrigendum-III, Corrigendum-IV

31st July 2017  (On e-Tendering Mode) 13th April  2017
170 Consultancy Services for Independent Engineer services for Six-laning of Kozhikode Bypass (Calicut Bypass) (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 (new NH-66) from D. Ch. km 230+400 to D. Ch. km 258.800 (total length 28.400 km) in the State of Kerala on Hybrid Annuity Mode.

NIT, RFP, Financial Bid, Corrigendum-ICorrigendum-II, Corrigendum-III,

22nd August 2017 (On e-Tendering Mode) 13th April  2017
171 Upgradation of NH-6 (AH-46) in Boregaon Manju City from Km.230.300 to Km.233.400 to four lane with paved shoulder configuration in the state of Maharashtra on EPC mode.

Bid vol-I, Bid Vol-II, Schedules, Plan & Profile & TCS Drawings, Corrigendum-ICorrigendum-II,  Corrigendum-IIICancellation notice

Cancelled 29th March 2017
172 CONSTRUCTION OF FLYOVER AT BUTIBORI-MIDC T-JUNCTION AT KM.26.280 ON NH-44(OLD NH-7) IN THE STATE OF MAHARASHTRA TO BE EXECUTED ON EPC MODE.

Bid vol-I, Bid Vol-II, Schedules, Drawings, Corrigendum-I, Reply to pre-bid Queries, Corrigendum-IIReply to pre bid Queries-IICancellation notice

Cancelled 29th March 2017
173 Balance work for 4-lanning of Bhopal-Biaora section of NH-12 from Lalghati km. 315.725 to Bhopal bypass junction km.324.000 (Pkg –I) on EPC Mode

NIT, E-Tendering procedure, Corrigendum-I, Addendum-I, Addendum-II, Corrigendum-III, Addendum-II, Corrigendum-IV, Corrigendum-VCorrigendum-VII, Corrigendum-VIII, Corrigendum-IX, Corrigendum-X, Corrigendum-XI,

18th July 2017  (On e-Tendering Mode) 7th March 2017
174 Balance work for Four Laning of Bhopal- Biaora Section of NH-12 from km 324.00 to km. 423.400 in the State of Madhya Pradesh (Package –II) on EPC Mode

NIT, E-Tendering procedure, Corrigendum-I, Addendum-I, Addendum-II, Corrigendum-II, Addendum-III, Corrigendum-IVCorrigendum-V, Corrigendum-VII, Corrigendum-VIII, Corrigendum-IX, Corrigendum-X, Corrigendum-XI,

18th July 2017  (On e-Tendering Mode) 7th March 2017
175 Consultancy services for Authority’s Engineer for Supervision of Upgradation of Yagyi – Kalewa section Milepost 40/0 to Milepost 115/5 in Myanmar to Two Lane with Earthen shoulder on EPC.

NIT, RFP, Corrigendum & Addendum-IIntegrity PactCorrigendum-II, Corrigendum-III, Corrigendum-IVCorrigendum-V, Revised RFP, Revised Financial Bid, Reply to pre-bid queries

1st August 2017 (On e-Tendering Mode) 23rd February 2017
177 Upgradation of Yagyi – Kalewa section Milepost 40/0 to Milepost 115/5 in Myanmar to two Lane with Earthen Shoulder on EPC mode.

NIT, RFP, DCA, Schedule, Integrity Pact, E-tender Process, Feasibility Report, Drawings, Corrigendum-I, Corrigendum-II,  Reply to pre-bid QueriesCorrigendum-III & Addendum-I, Corrigendum-IVPre-bid QueriesCorrigendum-V, Corrigendum-VI, Corrigendum-VII, Corrigendum-VII, Additional Pre- Bid Queries,

25th July 2017 (On e-Tendering Mode) 7th February 2017
178 6-laning of Kozhikode Bypass (Calicut Bypass) (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 (new NH-66) from design chainage km 230+400 to design chainage km 258.800 in the State of Kerala under NHDP Phase III on Hybrid Annuity mode.

NIT, E-Tender Process, RFP, DCA & Non Tech. Schedules, Technical Schedules, Executive Summary, DPR Vol I and II, DPR Vol III and IV, Bidding Document, Extension of Bid Due DateCorrigendum-II for extension of Bid due date, Pre-bid Reply, Modified Technical Schedules A B C D G, Modified Plan & Profile Drawings, Modified Structure Drawing, Updated Executive Summary, Corrigendum-III, Corrigendum-IV, Corrigendum-V,

18th August 2017  (On e-Tendering Mode) 31st January 2017
179 For Office accommodation for PIU-Bangalore (Expressway) of carpet area about 2500 sq.ft. with adequate parking facility.

Bid documentCorrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V, Corrigendum-VI, Corrigendum-VII, Corrigendum-VIII, Corrigendum-X, Corrigendum-XI, Corrigendum-XII, Corrigendum-XIII, Corrigendum-XIV, Corrigendum-XVCorrigendum-XVICorrigendum-XVII, Corrigendum-XVIII,

24th July 2017 1st January 2017
180 Four Laning of Loha –Waranga section of NH-361 from km 176.800 to km 244.369 (design length 67.569 km) under NH(O) in the State of Maharashtra on Hybrid Annuity Mode.

NIT, RFP, Technical Schedules, DCA, E-tender processCorrigendum-I, Reply to pre-bid queries, Appendix-I, Corrigendum-II, Corrigendum-III, Corrigendum - IV,

14th September 2017 (On e-Tendering Mode) 28th December 2016
181 Construction of Stand alone Ring Road/ Bypass around Jammu City (length 58.2 Km) on EPC Mode.

NITRFPTechnical ScheduleCorrigendum-ICorrigendum-II, Revised RFP & DCA, Schedules, Corrigendum-III, Corrigendum-IV, Corrigendum-VCorrigendum-VI, Corrigendum-VIICorrigendum-VIII,  

11th August 2017(On e-Tendering Mode) 30th November 2016
182 Construction of New 4-Lane Bridge (2 x 12.5m wide twin two lane structures) over River Ganga at downstream of Farakka Barrage including approaches connecting Farakka-Raiganj section of NH-34 from Km 290.940 (Design Chainage 0.000 km) to Km 296.805 (Design Chainage 5.468 km) in the State of West Bengal on EPC mode.

NIT, RFP, EPC with Schedule, Integrity pact, Plan Profile, GAD & TCS, Corrigendum-I, Corrigendum-II, Reply to pre-bid queries, DPR, Geotechnical and Hydrology Report, Corrigendum-III, Corrigendum-IVCorrigendum-V, Reply to pre-bid Queries, CORRIGENDUM-V ANNEXURE-I, CORRIGENDUM-V ANNEXURE-II, CORRIGENDUM-VI, CORRIGENDUM-VII, CORRIGENDUM-VIII, CORRIGENDUM-IX, CORRIGENDUM-X, CORRIGENDUM-XICORRIGENDUM-XIICorrigendum-XIII,

9th August 2017 (On e-Tendering Mode) 10th November 2016
183 Six Laning of Chakeri Allahabad section of NH-2 (from Km 483.687 to Km 628.753) in the state of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode.

NIT, RFP, DCASchedules, Amendment- I & II, Letter to Bidders & Amendment-3, Amendment- IV, Amendment-V & VI, Bidding Price, Letter & addendum-VII, Addendum-VIII, Bidding Cost, Amendment-IXAmendment-XBidding Excel , Amendment-XIRevised Bidding ExcelCorrigendum-IReply_of_pre-bid_queriesBidding ExcelExtension of due date

1st August 2017(On e-Tendering Mode)  1st November 2016
184 Development of Vadodara Mumbai Expressway from Km 254.430 to Km 378.740  (Kim to Vadodara Section) of Expressway under NHDP Phase – VI & Improvement of Additional Highway i.e., existing Vadodara Kim Section of NH-8 from Km 108.700 to Km 233.000 in the State of Gujarat to be executed on BOT (Toll) basis on DBFOT pattern.

RFQ, E-tendering process, Integrity Pact, Extension of Bid Due date, Invitation for pre-bid meeting, Cancellation of pre-bid meeting, Extension of Bid Due date-II, Extension of Bid Due date-III, Corrigendum-I, Reply to pre-bid queries, Extension of bid due date- IV, Extension of bid due date- V, Extension of bid due date-VI , Extension of bid due date-VII , Extension of bid due date-VIII , Extension of bid due date-IX , Extension of bid due date-X , Extension of bid due date-XI, Cancellation Notice,

Cancelled 10th August 2016
Note : Document is in a Pre-defined Format (PDF) that 
opens in Acrobat Reader only .In case, Acrobat Reader is not available , it can be downloaded from
www.adobe.com

This page was last updated on :
19th July  2017
.....................
Visitors:

Number of Visitor at NHAI Web Site(http://www.nhai.org/)

In case of any difficulty in downloading the Documents,
Please contact : DGM (P&IS)
Tel :+ 91 (011) 25074100 & 25074200 , Ext. 1517
Email :nhai.org@gmail.com, vasan@nhai.org, web-admin@nhai.org


Home | Indian Road Network | Mandate | Government Policy Incentives | Programmes | Project Maps | Concession Agreement | Procurement | Organizational Structure | Contact | Piu