Current Tender Related Notices :204

 

NOTE :  Any tempering or changes made in the downloaded bid documents will invite summary rejection.
S. No
Tender Related Notices
Last Date of Submission
1 Consultancy Services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for 134.00 Km section from km 00+00 to Km 134+00 of Ujjain- Jhalawar upto Rajasthan Border of SH-27 (proposed NH section) in the state of Madhya Pradesh (the “Project”) through DBFOT/EPC basis.

Result of Technical Evaluation

2 Short Term improvement and Routine Maintenance of Visakhapatnam Port Connectivity Project Corridor from Km 0.00 to Km 10.336 with main flyover and ramps in the State of Andhra Pradesh.

Result of Technical Evaluation

3 Maintenance/ Improvement of Guwahati Bypass on NH-37 from Jalukbari to Koinadhara (Km 146.172 to Km 163.895) in the state of Assam (Total length 17.723 Km) in 2017.

NIT, Bid Vol-I, Bid Vol-II, Financial Bid, BOQ, Corrigendum-I, Corrigendum-II, E-Tendering Procedure, Corrigendum-III, Cancellation order,

Cancelled
4 Upgradation of Yagyi – Kalewa section Milepost 40/0 to Milepost 115/5 in Myanmar to two Lane with Earthen Shoulder on EPC mode.

Result of Technical evaluation,

5 Providing the services of 3 Site Engineers,. 2 Stenographers, 2 Office Assistants, 2 poons, 1 Chowkidar & 1 Safaiwala (part time) in the office of Project Director PIU Dwarka, New Delhi.

Technical Evaluation,

6 Independent Engineer services during balance construction period and O&M period for Four laning of Gwalior-Shivpuri section of NH-3 from km 15.600 of NH-75 (End of Gwalior bypass) to km 236.00 of NH-3 in the state of Madhya Pradesh on BOT (Toll) on DBFOT Pattern under NHDP Phase-IV.-  (2nd call)

  Technical Evaluation,

7 Facility Services in NHAI’s Corporate Office, New Delhi. (Providing manpower viz Computer Operators, Customer Relation Operator, Messenger, Dispatch Riders, Clerk etc.

Bid Cancellation Notice,

8 Balance work of 4-laning of Lalghati (Bhopal) to Mubarakpur section of NH-12 from Lalghati at km 315.725 to km. 324.00. Bhopal bypass junction to be executed under NH (O) (Pkg-I) on EPC mode in the state of MP

Result of Technical Evaluation,

9 Consultancy Services for Authority’s Engineer for Supervision for balance work for 4-lanning of Bhopal-Biaora section of NH-12 from Lalghati km. 315.725 to Bhopal bypass junction km. 324.00 (PKG-I) and balance work for 4-lanning of Bhopal-Biaora section of NH-12 from km. 324.00 to km. 423.40 (PKG-II) in the State of Madhya Pradesh on EPC Mode.

Cancellation Circular,

10 Independent Engineer Services for Four Laning of Mahuva to Kagavadar Section of NH-8E from Km. 100.100 to Km 139.915 (Design Chainage from Km 100.450 to km 140.470) (Package-III) in the State of Gujarat on Hybrid Annuity Mode under NHDP Phase IV.

Result of Technical Evaluation,

11 Independent Engineer Services during O & M phase of 4 laned Vadape – Gonde (Km 539.5 – Km 440) section of NH 3 (New NH - 160) and Dhule – Pimpalgaon (Km 265 – Km 380) section of NH 3 (New NH - 60) in the State of Maharashtra.

Result of Technical Evaluation,

12 Independent Engineer Services for Four laning with paved shoulder of Porbandar - Dwarka section of NH-8E (Ext.) from km 356.766 (Design Chainage km 379.100) to km 473.000 (Design Chainage km 496.848) in the State of Gujarat through Public Private Partnership (PPP) on Hybrid (Annuity) mode.

Result of Technical Evaluation,

13 Independent Engineer (IE) Services during Operation & Maintenance Period of Four lane Chenani - Nashri section of NH-44 (Old NH-1A) from km. 89.00 to km. 130.00 including 9 km long tunnel (2 lane) with parallel escape tunnel in the state of Jammu & Kashmir (2nd Call).

Result of Technical Evaluation,

14 Consultancy Services for Appointment of Technical Consultant to Carry Out the Feasibility Study and Preparation of Detailed Project Report for 140.45 km section from km 1.550 to Km 142.00 including construction of bypasses for Dudhiya, Double Chouki, Chapda, Kannod and Khategaon of Indore-Harda section of NH-59A in the state of Madhya Pradesh (the “Project”) through DBFOT/EPC basis.

Result of Technical Evaluation,

15 Independent Engineer services for Two laning of balance work and Operation & Maintenance of Trichy – Karaikudi including Trichy Bypass road section of NH-210 from (Km 10.000 to Km 94.000) and Bypass (Km 110.016 to Km 135.930) in the state of Tamil Nadu on DBFOT Annuity Basis under NHDP phase-III

Result of Technical Evaluation, annexure, Opening of Financial Bid,

16 Independent Engineer services for Two lanes with/without paved shoulders of Tindivanam – Krishnagiri section of NH-66 from Km 37.600 to Km 219.782 (Design Chainage) – DBFOT (Annuity) basis – Under NHDP Phase-III - in the State of Tamil Nadu.

Technical Evaluation, Technical Evaluation criteria , Opening of Financial Bid,

17 Two lanes with paved shoulders of Tindivanam-Krishnagiri section of NH-66 from Km 37.600 to Km 219.782 (Design Chainage) – DBFOT (Annuity) basis – Under NHDP Phase-III in the State of Tamil Nadu – Estimate for Partially completed locations and diversion stretches from Km 147.000 to Km 219.782. Package no:ROChennai/2017 - 18/Civilworks/05)

Bid document, Result of Technical Evaluation,

18 4-laning of Thalssery-Mahe Bypass section of NH-17 from km 170.600 (design chainage km 170.600) to km 188.000 (design chainage km 189.200) in the State of Kerala under NHDP Phase-III on EPC mode.

Technical evaluation resultOpening of Financial Bid,

19 CONSULTANCY SERVICES FOR AUTHORITY’S ENGINEER FOR SUPERVISION OF Construction of Left Out Works including Junagadh Bypass (Length 19.80 km) on Four Laning of Jetpur – Somnath Section of NH 151 (Old NH 8D) Between Km. 0.000 to Km. 123.454 in Gujarat State.

Opening of Financial Bid,

20 Improvement/Augmentation of 2 laning with paved shoulders from km. 94.000 to km. 174.000 (Design chainage from km. 94.000 to km. 174.000) of Karaikudi –Ramanathapuram section of NH-210 including 500m on SH-35-Madurai Road (near Devakottai Rasta Railway Station in the State of Tamil Nadu on EPC mode [Total design length =80.000 Km.] under NHDP III.

Opening of Financial Bid,

21 Independent Engineer services for Four laning of Cholopuram – Thanjavur from km. 116.440 to 164.275 section of NH-45C in the state of Tamilnadu under NHDP-IV on Hybrid Annuity Mode

Technical evaluation resultExtension of Bid Validity

22 Periodic Renewal by resurfacing and other safety devices for Two Lane Chenani- Nashri stretch (old alignment) from Km 89.00 to Km 130.00 of NH-44 in the State of Jammu and Kashmir (2nd Call)

Result of Technical Evaluation,

23 Improvement/Augmentation of 2 laning with paved shoulders from km. 94.000 to km. 174.000 (Design chainage from km. 94.000 to km. 174.000) of Karaikudi –Ramanathapuram section of NH-210 including 500m on SH-35-Madurai Road (near Devakottai Rasta Railway Station in the State of Tamil Nadu on EPC mode [Total design length =80.000 Km.] under NHDP III.-- 
                               Bid Validity extended to *** 31st August  2017(On e-Tendering Mode)***

NIT, RFP, DCA , Integrity PactE-tender Process, Corrigendum-I, Revised RFP, Revised DCA, Schedule, Plan & Profile, Structure Drawings, Corrigendum-IV, Corrigendum-V,

24 Four Laning of Sethiyahopu – Cholopuram from km 65.960 to km 116.440 section of NH-45C in the state of Tamilnadu under NHDP Phase-IV on Hybrid Annuity Mode.

NIT, RFP, Financial Bid, DCA, Schedules, Executive summaryGADs, Plan & ProfileExtension of Bid due date, Extension of Bid due date, Corrigendum-IVBid due date extension, Opening of Financial Bid, Extension of Bid Validity

25 Supply & fixing of prefabricated portable toilets (Ladies & Gents) under Swachh Bharat Mission at Paschim Madati Toll Plaza at Km 547.350 of NH-31 in the state of West Bengal. [Contract Package : 02/2017-18 (WB)].

NIQBid document

1st August  2017
26 Supply & fixing of prefabricated portable toilets (Ladies & Gents) under Swachh Bharat Mission at Guabari Toll Plaza at Km 243.00 of NH-31C in the state of West Bengal. [Contract Package : 03/2017-18 (WB)]. 

NIQBid document

1st August  2017
27 Supply & fixing of prefabricated portable toilets (Ladies & Gents) under Swachh Bharat Mission at Surjapur Toll Plaza at Km 451.00 of NH-31 in the state of West Bengal. [Contract Package : 04/2017-18 (WB)].

NIQBid document

1st August  2017
28 Emergent Repair & Maintenance works contract for improvement of black spot identified by Police Department (ADGP, CID, (HP) on CMM road NH-21 (New NH-03) by Rock cutting at RD 237/292 to 237/312 near Markanda Temple Thalout in the state of Himachal Pradesh 

NIT

1st August  2017
29 Procurement & Installation of Office Furniture & Equipment for NHAI, PIU-Nanded

NITBid document, BOQ,

1st August  2017
30 Improvement of T Junction near Dhaula Kuan Metro Station including widening of National Highway from Dhaula Kuan up to end of Junction on NH-8 and improvement of T Junction near Defence area including widening of National Highway up to Defence area on NH-8 and R&R Hospital Link Underpass on EPC Mode in the State of Delhi.

NIT, RFP, Schedule, EPC Agreement, E-tender Process, DrawingsPre-bid reply to QueriesCorrigendum-ICorrigendum-IICorrigendum-IIICorrigendum-IV, Corrigendum-V,

2nd August 2017 (On e-Tendering Mode)
31 Six Laning of Chakeri Allahabad section of NH-2 (from Km 483.687 to Km 628.753) in the state of Uttar Pradesh under NHDP Phase V on Hybrid Annuity Mode.

NIT, RFP, DCASchedules, Amendment- I & II, Letter to Bidders & Amendment-3, Amendment- IV, Amendment-V & VI, Bidding Price, Letter & addendum-VII, Addendum-VIII, Bidding Cost, Amendment-IXAmendment-XBidding Excel , Amendment-XIRevised Bidding ExcelCorrigendum-IReply_of_pre-bid_queriesBidding ExcelExtension of due date

1st August 2017(On e-Tendering Mode) 
32 PROVIDING, RUNNING, & MAINTENANCE OF COMMERCIAL VEHICLES ON MONTHLY HIRE BASIS FOR NHAI, (PIU-KOTA).

NIT, Bid document, Extension of bid opening date,

1st August  2017
33 Construction of 4 Lane Oddanchathram Bypass from Km. 23.230 to Km. 30.900 of NH-209 (new NH No. 83), (Design chainage from Km. 23.100 to Km. 33.200) under NHDP-IV, in the State of Tamil Nadu on EPC Mode.

NIT, RFP, EPC Agreement, RFP, E-Tendering, Extension of Bid due date, Corrigendum-II, Corrigendum-III,

1st August 2017 (On e-Tendering Mode)
34 ADDITIONAL FACILITATES FOR 4-LANE DIVIDED HIGHWAY OF KM. 52.250 TO KM. 130.560 OF NH-58 (MEERUT-MUZZAFFARNAGAR SECTION) IN THE STATE OF UTTAR PRADESH ON EPC MODE.

NIT, RFP, DCA, Schedule, Drawing, E-tender ProcessAmendment-I

1st August 2017 (On e-Tendering Mode)
35 Excavation for roadway in hard rock with controlled blasting by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and crosssections, loading and disposal of cut rock with a lift upto 1.5 m and leads upto 1000 m as per Technical Specification Clause 302.3.5 

NIT, Bid document, BOQ,

1st August  2017 (On e-Tendering Mode)
36 AUCTION OF ROAD CONSTRUCTION MACHINERY, LABORATORY EQUIPMENTS, CONSTRUCTION MATERIAL AND OTHER SCRAP MATERIAL LYING AT PROJECT SITE CAMP IN VILLAGE CHILVAHA DISTRICT RAISEN, AT CHAINAGE 32.700 (NEAR COLLECTOR OFFICE) & AT CHAINAGE 44.000 OF RAISEN TO SALAMATPUR JUNCTION OF BHOPAL–SANCHI SECTION OF NH-86 (EXTN.) (3RD CALL).

Bid document,

3rd August  2017 (On e-Tendering Mode)
37 Providing, running and maintenance of Mahindra Scorpio or equivalent commercial vehicle(s) for O/o SDO (Revenue) & CALA Narsinghgarh, District Rajgarh (3rd call).

Bid document,

3rd August  2017 (On e-Tendering Mode)
38 Maintenance/ Improvement of Guwahati Bypass on NH-37 from Jalukbari to Koinadhara (Km 146.172 to Km 163.895) in the state of Assam (Total length 17.723 Km) in 2017.

NIT, Bid Vol-I, Bid Vol-II, Financial Bid, BOQ, Corrigendum-I, Corrigendum-II, E-Tendering Procedure, Corrigendum-III, Cancellation Letter,

Cancelled
39 Hiring of premises for Office Accommodation for NHAI, PIU- Varanasi.

NIT,

3rd August  2017
40 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT NURUDDINPUR FEE PLAZA AT KM 40.000 FOR THE SECTION FROM KM 0.000 TO KM 86.000 (RAEBAREILLY – JAUNPUR SECTION) OF NH-231 (NEW NH-31) IN THE STATE OF UTTAR PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

3rd August  2017(On e-Tendering Mode)
41 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT SRIRAMPUR FEE PLAZA AT KM 3.588 FOR THE SECTION FROM KM 0.000 TO KM 76.588 (CHANDIKHOL- PARADIP) OF NH-5A IN THE STATE OF ODISHA.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

3rd August  2017(On e-Tendering Mode)
42 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Balgudar fee plaza located at km 23.500 in the section of Mokama-Munger (Km 1.430 to Km 70.000) on NH-80 in state of Bihar (Annuity Project).

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

4th August  2017(On e-Tendering Mode)
43 Appointment of Safety Consultant for the following projects
1. Two/ Four laning of BRT Tiger Reserve Boundary to Bangalore Section of NH-209 (Existing chainage from Km. 287.520 to Km. 461.550) in the state of Karnataka on Hybrid Annuity mode under NHDP Phase – IV.”
2. Six laning of Chitradurga – Davengere including Chitradurga Bypass (Km.189.000 to Km.260.000 of NH-48 (Old NH-4) in the State of Karnataka to be executed on Hybrid Annuity Mode on DBFOT under NHDP Phase V 
3. Six laning of Davengere – Haveri from Km.260.000 to Km.338.923 of NH-48 (Old NH-4) in the State of Karnataka to be executed on Hybrid Annuity Mode on DBFOT under NHDP Phase V
4. Six laning & Strengthening of Km.340.000 to Km.403.400 of Hubli-Haveri section of NH-48 (Old NH-4) in the State of Karnataka to be executed on Hybrid Annuity Mode on DBFOT under NHDP Phase V.

NIT, RFP, Schedule, Policy matterCorrigendum-I,

7th August  2017(On e-Tendering Mode)
44 TECHNICAL CONSULTANT FOR PREPARATION OF DETAILED PROJECT REPORT INCLUDING PRE-CONSTRUCTION ACTIVITIES FOR CONSTRUCTION OF A ROAD TUNNEL WITH ITS APPROACHES INCLUDING JUNCTION WITH DWARKA EXPRESSWAY FOR WESTERN CONNECTIVITY TO IGI AIRPORT FROM DWARKA EXPRESSWAY IN THE STATE OF DELHI.

RFP, Financial Bid, Instruction to Bidders, Reply to pre-bid Queries, Amendment-I, Amendment-II,

7th August  2017(On e-Tendering Mode)
45 Consultancy services for Authority Engineer of Rehabilitation and Up-Gradation to 4-Laning of Biramitrapur-Brahmani Bypass end of NH-23 (New NH No. 143) Km 211.200-Km 237.100 & from Km 0.000-Km 3.200 (Brahmani By-Pass) i.e. upto Km 240.100 (Package I-A) and Km. 240.250 i.e. Brahmani By-Pass End Beside BNR Weigh Bridge to Km. 287.200 i.e. Rajamunda Section on NH-23 in the State of Odisha under NHDP IV, Package I-B.

NIT, RFP , Financial Bid 

7th August  2017(On e-Tendering Mode)
46 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KELWAD TOLL PLAZA AT KM 13.000 (EXISTING CHAINAGE AT KM 74.600) FOR THE SECTION FROM 0.000 TO KM 75.60 (SAONER CHINDWARA SECTION) ON NH-547 IN THE STATE OF MADHYA PRADESH & MAHARASHTRA.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode)
47 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT BANTHADI FEE PLAZA AT KM 34.000 FOR TWO LANE WITH PAVED SHOULDERS OF NIMBIJODHA (NEAR LADNU)-DEGANA-MERTA CITY SECTION OF NH-458 (PACKAGE-I) FROM KM 0.000 (EXISTING CHAINAGE KM 0.000) TO KM 139.900 (EXISTING CHAINAGE KM 144.377) (LENGTH 139.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode)
48 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT TAMDOLI FEE PLAZA AT KM 93.500 FOR TWO LANE WITH PAVED SHOULDERS OF NIMBIJODHA (NEAR LADNU)-DEGANA-MERTA CITY SECTION OF NH-458 (PACKAGE-I) FROM KM 0.000 (EXISTING CHAINAGE KM 0.000) TO KM 139.900 (EXISTING CHAINAGE KM 144.377) (LENGTH 139.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode)
49 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS FOR AT BRAHMARKOTLU FEE PLAZA AT KM 331.290 (UNDER NEW MANGALORE PORT CONNECTIVITY PROJECT) IN THE SECTION OF B.C. ROAD TO PADIL AND PADIL BYPASS FROM KM 328.000 TO KM 345.000 & 1.6 KM OF BYPASS OF NH-48 (NEW NH-73) IN THE STATE OF KARNATAKA.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

7th August  2017(On e-Tendering Mode)
50 Consultancy Services for Supervision for Short Term Improvement and Routine Maintenance / Special Repairs / Periodical Renewals / Civil Works Contract of Divancheruvu – Gundugolanu Section from Km.901.753 to Km.1022.494 on NH-16 (old NH-5) in the State of Andhra Pradesh.

NIT, RFP, Financial Bid, Infracon Operation Procedure, E-tender Process

8th August  2017 (On e-Tendering Mode)
51 Consultancy Services for Supervision for Short Term Improvement and Routine Maintenance / Special Repairs / Periodical Renewals / Civil Works Contract of (a) Anandapuram- Visakhapatnam - Anakapalli section from Km 682.980 to Km 741.256 (length – 58.276 Kms) of NH-16 (Old - NH-5) (b) Visakhapatnam Port connectivity Project corridor from Km 0.0 to Km 10.336 with main flyover and ramps (length - 12.50 Kms); in the state of Andhra Pradesh.

NIT, RFP, Financial Bid, Infracon Operation Procedure, E-tender Process

8th August  2017 (On e-Tendering Mode)
52 Consultancy services for Authority’s Engineer for Supervision of Upgradation of Yagyi – Kalewa section Milepost 40/0 to Milepost 115/5 in Myanmar to Two Lane with Earthen shoulder on EPC.

NIT, RFP, Corrigendum & Addendum-IIntegrity PactCorrigendum-II, Corrigendum-III, Corrigendum-IVCorrigendum-V, Revised RFP, Revised Financial Bid, Reply to pre-bid queriesCorrigendum-VI, Corrigendum-VII, Corrigendum-VIII, Reply to pre-bid queries-II

9th August 2017 (On e-Tendering Mode)
53 Widening of Brahmarakotlu Toll Plaza from existing 2+2 lanes to 3+3 lanes with staggered arrangements with necessary Civil Works for ETC lane at Km. 331.290 of NH-48 under New Mangalore Port Road Connectivity (5th Call) 

NIT, Bid vol-IBid vol-II, Financial Bid

9th  August  2017(On e-Tendering Mode)
54 Shifting of Water Supply Pipeline in Kagvadar-Una project (Pkg-IV) chainage Km.139+915 to Km.180+478 of NH-8E in the State of Gujarat.

NITBid Vol-IBid Vol-IIFinancial BidCorrigendum-I, Corrigendum-II, Modified Financial Bid

9th August  2017 (On e-Tendering Mode)
55 Construction and Operation of Wayside Amenities at km 741+600 (RHS) of NH-4, Pune-Satara Section, Varye village, Satara Taluk, Satara district, Maharashtra under BOT Mode (Build, Operate, Transfer).

Bid Vol-I, Bid Vol-II, Financial Bid, Site Feasibility Report, Corrigendum-I, Drawings of wayside amenities, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V, Amendment-III, Reply to QueriesPre-bid reply, Corrigendum-VICancellation Notice,  

Cancelled
56 Supply of Machinery such as poklen Excavator 200 LC, JCB & Hywa on daily basis for encroachment drive for NH-32 under PIU- Dhanbad. -2nd call

Bid documentOffice order

10th August  2017
57 Consultancy Services for Consultancy Services for preparation of Feasibility Report cum Details Project Report (DPR) of 4 laning of Agra Bypass (Northern) Connecting left over portion of various National Highways / Expressways surrounding the Agra City in the state of Uttar Pradesh.

Bid document

10th August  2017 (On e-Tendering Mode)
58 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KM 132.400 AT KUNWARPUR FEE PLAZA FOR THE SECTION FROM KM 86.000 TO KM 166.400 ON NH-231 (NEW NH 31) (RAEBAREILLY JAUNPUR SECTION) IN THE STATE OF UTTAR PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

10th August  2017(On e-Tendering Mode)
59 CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF FOUR LANE ODDANCHATRAM BYPASS FROM KM 23.230 TO KM 30.900 OF NH – 209 (NEW NH NO. 83), (DESIGN CHAINGAE FROM KM. 23.100 TO KM. 33.200) UNDER NHDP – IV, IN THE STATE OF TAMIL NADU, ON EPC MODE. 

NITRFPFinancial ProposalIntegrity pactExtension of Bid due date,

10th August 2017 (On e-Tendering Mode)
60 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Runni Toll Plaza at Km. 26.090 on Muzzaffarpur-Sonbarsa 2 lane with Paved Shoulder section from Km. 2.800 to Km. 89.00 on NH-77 in the state of Bihar (Annuity Project).

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

10th August  2017(On e-Tendering Mode)
61 Construction and Operation of Wayside Amenities at Km 124+030 (RHS) of NH-7, Madurai to Kanniyakumari Section, Vadaku lIlandhaikulam Village Road, Near Salaipudur Toll, Thoothukudi Dist., Tamil Nadu under BOT Mode (Build, Operate, Transfer) (Package No: WSA/TN/Phase 1/NH 44/350)

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IVAmendment-III, reply to queries , Pre-bid reply, Corrigendum-VCancellation Notice,  

Cancelled
62 Construction and Operation of Wayside Amenities at km 29-30 (RHS) of NH-11, Jaipur-Agra Section, Sunari, near Bharatpur, Rajasthan under BOT Mode (Build, Operate, Transfer) (Package No: WSA/RJ/Phase 1/NH 21/348)

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-IDrawingsAmendment-I, Corrigendum-IV, Amendment-III, Reply to queries , Pre-bid reply, Corrigendum-VCancellation Notice,  

Cancelled
63 Construction and Operation of Wayside Amenities atkm 365+360 (LHS) of NH-63, Bellary - Guntakal Section, Paramadevanahalli Village, Bellary Taluk, Bellary Dist., Karnatakaunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/KA/Phase 1/NH 67/310)

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IV, Amendment-III, reply to queries, Pre-bid reply, Corrigendum-VCancellation Notice,  

Cancelled
64 Construction and Operation of Wayside Amenities atkm 186+500(LHS) of NH-544 (old NH-47) of Walayar - Vadakkanchery Section, Vattapara, Pudussery East Village, Near Walayar Police Station, Palakkad Dist, Kerala under BOT Mode.

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IV, Amendment-III ,Reply to queries, Pre-bid reply, Corrigendum-VCancellation Notice,  

Cancelled
65 Construction and Operation of Wayside Amenities at Km 15+550 (RHS) of NH-3, Indore - Khalghat Section, PithampurChaupati village, Pithampur Tehsil, Dhar District, Madhya Pradesh under BOT Mode (Build, Operate, Transfer) (Package No: WSA/MP/Phase 1/NH 52/29).

RFPDCAFeasibility ReportFinancial BidSite LayoutCorrigendum-I, Addl. Site Data Report & DrawingsAmendment-I, Corrigendum-IV, Amendment-III, reply to queries, Pre-bid reply, Corrigendum-VCancellation Notice,  

Cancelled
66 Appointment of Safety Consultants for Six laning of Ranasthalam – Anandapuram section of NH-16 from Km 634.000 to Km 681.000 in the State of Andhra Pradesh under NHDP Phase V on Hybrid Annuity Mode (Package-II).

Letter to Bidders, RFP, Form of Financial Proposal, Schedule, Appendix

10th August  2017 (On e-Tendering Mode)
67 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT RAKSHA FEE PLAZA AT DESIGN KM 1374.650 FROM BARAN-SHIVPURI SECTION FROM KM 1305.087 TO KM 1380.387 ON NEW NH-27 IN THE STATE OF UTTAR PRADESH

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

10th  August  2017(On e-Tendering Mode)
68 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT MUNDIYAR FEE PLAZA AT DESIGN KM 1217.725 FROM BARAN-SHIVPURI SECTION FROM KM 1184.322 TO KM 1251.814 ON NEW NH-27 IN THE STATE OF UTTAR PRADESH

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

10th  August  2017(On e-Tendering Mode)
69 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT RAMNAGAR FEE PLAZA AT DESIGN KM 1280.370 FROM BARAN-SHIVPURI SECTION FROM KM 1251.814 TO KM 1305.087 ON NEW NH-27 IN THE STATE OF UTTAR PRADESH

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

10th  August  2017(On e-Tendering Mode)
70 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS FOR AT DASNA FEE PLAZA AT KM 29.30 IN THE SECTION FROM KM 27.643 TO KM 48.638 & BYPASS 11.250 ON NH-24 (GHAZIABAD HAPUR & HAPUR BYPASS SECTION) IN THE STATE OF UTTAR PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

11th August  2017 (On e-Tendering Mode)
71 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT KONDER FEE PLAZA AT KM 91.800 ON THE PROJECT OF CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER OF KARAULI TO DHOLPUR SECTION OF NH-11B FROM KM 83.960 TO KM 184.460 (LENGTH 100.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

11th August  2017 (On e-Tendering Mode)
72 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT CHILA CHOND FEE PLAZA (KM 142.350) ON THE PROJECT OF CONSTRUCTION OF 2 LANE WITH PAVED SHOULDER OF KARAULI TO DHOLPUR SECTION OF NH-11B FROM KM 83.960 TO KM 184.460 (LENGTH 100.900 KM) IN THE STATE OF RAJASTHAN.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

11th August  2017 (On e-Tendering Mode)
73 Construction of NH-24 4-lane bypass starting from km 479.500 of NH 24 and terminating at km 17.600 of MDR-77C (bypass chainage from km 64.900/64.380 to km 79.516/79.000 total length 14.618 km) in the State of Uttar Pradesh under NHDP Phase-VII on EPC Mode.

  NITRFPDCAIntegrity pactSchedule

14th August  2017 (On e-Tendering Mode)
74 Incident Management for the stretch from Km.11+000 to Km. 54+400 of Chennai – Tada Section of NH-5 in the State of Tamil Nadu for a period of 4 months.

Bid document

14th August  2017
75 Consultancy Services for preparation of feasibility report cum Detailed Project Report (DPR) of 4/6 lane (A) Belgaum Bypass (East) tentatively from Km 9.500 (NH 4A) To Km 515.000 (NH 4) (22 Km) and (B) Belgaum Bypass (West) from Km 515.000 (NH 4) to Km 492.000 (NH 4) (New NH 48) (33 Km) in the State of Karnataka.

RFP, Corrigendum-I, Pre-bid meeting, Corrigendum-II, Modified RFP,

16th August  2017(On e-Tendering Mode)
76 Consultancy Services for feasibility study and preparation of detailed project report for 4 laning of Basukinath - Deoghar section of NH-114A under NHDP Phase-IV in the state of Jharkhand.

RFP, Infracon, Integrity Pact, Corrigendum-I, Addendum-I, Revised RFP document, Corrigendum-II, Reply to pre-bid Queries,

16th August  2017(On e-Tendering Mode)
77 Supply of Manpower/support staff on short term contract basis in the piu office at Dhanbad.

Bid document, Office order reg. bid opening date,

16th August  2017
78 Consultancy services for Authority’s Engineer for Improvement of T Junction near DhaulaKuan Metro Station including widening of National Highway from DhaulaKuan up to end of Junction on NH-8 and improvement of T Junction near Defence area including widening of National Highway up to Defence area on NH-8 and R&R Hospital Link Underpass on EPC Mode in the State of Delhi.

NIT, RFP, Integrity Pact, Appendix, Pre-Proposal Conference/Pre-bid Meeting -Reg., Corrigendum-I, Corrigendum-II,

17th August  2017(On e-Tendering Mode)
79 Six Laning of Pimplgaon-Nashik-Gonde Section of NH-03 from Km 380.000 to Km 440.000 in the state of Maharashtra - Balance / Additional Works on EPC Mode.

RFPFinancial BidEPCExecutive SummarySchedules, Pre-bid Queries Reply, Geotechnical reports, Corrigendum-I , Corrigendum-III, Corrigendum-IV,

17th August 2017 (On e-Tendering Mode)
80 Consultancy Services for Authority’s Engineer Services for Rehabilitation & Upgradation of Two laning of Maheshkhunt – Saharsa - Purnea section of NH 107 from km. 0.000 to km. 90.000 in the State of Bihar on EPC Mode (Package-I).

NIT, RFPAddendum-IAddendum-IIAddendum-III,

17th August 2017 (On e-Tendering Mode)
81 Hiring of Office accommodation for NHAI, RO-Kerala.

NIT, Bid vol-I, Bid Vol-II,

17th August  2017
82 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Nemili Sriperumpudur fee plaza at km 37.800 [for a length of 46.500 km] for the section from km 106.800 to km 13.800 (Walajahpet - Poonamallee Section) of NH-4, in the state of Tamil Nadu.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

18th August  2017 (On e-Tendering Mode)
83 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Chennasamudram fee plaza at km 104.900 [for a length of 46.500 km] for the section from km 106.800 to km 13.800 (Walajahpet - Poonamallee Section) of NH-4, in the state of Tamil Nadu under.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

18th August  2017 (On e-Tendering Mode)
84 For supply & installation of 1 No. 25 KVA Diesel Kirloskar Generator set at NHAI, PIU-Mandi

Bid document,

18th August  2017
85 Consultancy services for Feasibility Study and Preparation of DPR for Total Length 9.000 Km. for;
(i) Construction of Elevated corridor at Sarojini Nagar and Banthara (Km. 14.300 & Km. 23.000) on Lucknow Kanpur Section of NH-25- (Length 4 Kms).
(ii) Construction of Elevated corridor from Shaheed Path to PGI (Km. 12.700 to Km.16.000) on Lucknow Raebareli Section of NH-24B (length 3.300Kms).
(iii) Construction of Elevated corridor from near Madiaon to IIM Crossing (Km. 488.270 to Km. 486.570) on Lucknow Sitapur Section of NH-24 (Length 1.700 Kms).

Bid document,

19th August  2017 (On e-Tendering Mode)
86 Collection of Traffic Data by use of Automated Traffic Counter and Classification System supported with Video Based Traffic Survey on 24x7x365 basis in free flow mode of Traffic on Surat - Dahisar Section of NH-8 (New NH-48) Project Highway.

RFPBOQE-tender processCorrigendum-ICorrigendum-IIIntegrity pactCorrigendum-III, Reply to queries-I, Reply to Queries-IICorrigendum-IV

21st August  2017 (On e-Tendering Mode)
87 Providing the service of One No. Stenographer, Two Nos. Office Assistant, One No. Computer Operator, and Three Nos. Peon, One Safaiwala (Part Time)/ Attendant staff required on Short term Contract basis and service of any other personnel required on casual basis time to time.

Bid document,

21st August  2017
88 Supply of stationary items to RO - Patna.

 Bid document

21st August  2017
89 Supply of Commercial Vehicle at NHAI, RO - Ranchi on monthly rent basis.

Bid document,

21st August  2017
90 Consultancy Services for preparation of Feasibility Study/Detailed Project Report for Construction of new 4-lane Elevated Road from Chennai Port to Maduravoyal (NH-4) in the State of Tamil Nadu under NHDP Phase VII – 3rd Call.

RFP,

21st  August  2017(On e-Tendering Mode)
91 INDEPENDENT ENGINEER SERVICES FOR OPERATION AND MAINTENANCE OF Operation and Maintenance of four laned Jalandhar to Punjab/JK Border (km 4.230 to km 117.750/ 4.000 and km 4.000 to km 16.350) of NH-1A IN THE STATE OF PUNJAB ON OMT BASIS (PACKAGE – OMT -21A).

RFP, Financial Bid, Infracon Operation Procedure, Integrity Pact Format, Amendment-I, Amendment-II, Amendment-III, Amendment-IV,

21st August 2017 (On e-Tendering Mode)
92 Construction and Operation of Wayside Amenities at km 187+700(RHS) of NH-544 (old NH-47) of Walayar - Vadakkanchery Section, Vattapara, Pudussery East Village, Near Walayar Police Station, Palakkad Dist, Kerala under BOT Mode (Build, Operate, Transfer) (Package No: WSA/KL/Phase 1/NH 544/259)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV, Amendment-III, reply to queries , Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
93 Construction and Operation of Wayside Amenities atkm 211+000, RHS of Forbesganj - Simrahi Section of NH 57, Dodra Village, Chattapur Tehsil, Supaul dist., Bihar under BOT Mode (Build, Operate, Transfer) (Package No: WSA/BR/Phase 1/NH 27/232)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV, Amendment-III, reply to queries, Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
94 Construction and Operation of Wayside Amenities atkm 209+100 LHS of Forbesganj to Simrahi section of NH-57, Garhia village, Pratapganj Tehsil, Supaul dist., Bihar under BOT Mode (Build, Operate, Transfer) (Package No: WSA/BR/Phase 1/NH 27/231)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV, Amendment-III, reply to queries, Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
95 Construction and Operation of Wayside Amenities atkm 63+300 (RHS) of NH-3 of Indore - Khalghat Section, Lodhipur village, Dharampuri Tehsil, Dhar District, Madhya Pradeshunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/MP/Phase 1/NH 52/31)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV, Amendment-III, reply to queriesPre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
96 Construction and Operation of Wayside Amenities atKm 15+550 (LHS) of NH-3, Indore - Khalghat Section, PithampurChaupati village, Pithampur Tehsil, Dhar District, Madhya Pradeshunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/MP/Phase 1/NH 52/28)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site data Report, Corrigendum-I, Standard drawings, Amendment-I, Corrigendum-IV, Amendment-III, reply to queries, Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
97 Construction and Operation of Wayside Amenities at km 353+542 (LHS) (old km 348+345), Gorakhpur to Salemgarh of NH 28, Tamakuhi Raj, Kushinagar dist., Uttar Pradesh under BOT Mode (Build, Operate, Transfer) (Package No: WSA/UP/Phase 1/NH 27/195)

RFP, Financial ReportDCA, Feasibility Report, Drawings, Site data Report,Site data Report , Amendment-I, Corrigendum-IV, Amendment-III, reply to queries , Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
98 Construction and Operation of Wayside Amenities atkm 355+202 (RHS) (old km 350+330), Gorakhpur to Salemgarh of NH-28, Tamakuhi Raj, Kushinagar dist., Uttar Pradeshunder BOT Mode (Build, Operate, Transfer) (Package No: WSA/UP/Phase 1/NH 27/196)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV, Amendment-III, reply to queries , Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
99 Construction and Operation of Wayside Amenities atKm 304+600 (RHS) Tirupathi - Tiruthani - Chennai Section of NH 205, S V Puram Village, Vadamalaipetta, Chitoor Dist, Andhra Pradesh under BOT Mode (Build, Operate, Transfer) (Package No: WSA/AP/Phase 1/NH 716/270)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV, Amendment-III, reply to queries , Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
100 Construction and Operation of Wayside Amenities at km 29-30 (LHS) of NH-11, Jaipur-Agra Section, Sunari, near Bharatpur, Rajasthan under BOT Mode (Build, Operate, Transfer) (Package No: WSA/RJ/Phase 1/NH 21/347)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV, Amendment-III, reply to queries , Pre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
101 Construction and Operation of Wayside Amenities atkm 47+100 (LHS) of Hosur - Krishnagiri Section of NH 7, Perandapalli, Krishnagiri, Tamil Nadu under BOT Mode (Build, Operate, Transfer) (Package No: WSA/TN/Phase 1/NH 44/351)

RFP, Financial ReportDCAFeasibility Report, Drawings, Site layout Report, Amendment-I, Corrigendum-IV, Amendment-III, Reply to queriesPre-bid reply, Corrigendum-V

21st August 2017 (On e-Tendering Mode)
102 Designing and Printing of NHAI Calendars for the year 2018.

RFP,

21st  August  2017(On e-Tendering Mode)
103 Consultancy Services for Preparation of Detailed Project Report of Delhi-Ludhiana- Amritsar- Katra Expressway having an approximate length of 600 Km (the "Project") including spurs through BOT& EPC basis (5th Call)

NIT, RFP, Financial Proposal, Letter to Bidders, DPR Check- List, Revised NIT, Revised RFP, Revised Financial Bid, Revised Letter to Bidders, Corrigendum-I, Reply to pre-bid queries-I, Corrigendum-II, Reply to pre-bid queries-II,

21st August  2017(On e-Tendering Mode)
104 For Office accommodation for PIU-Bangalore (Expressway) of carpet area about 2500 sq.ft. with adequate parking facility.

Bid documentCorrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V, Corrigendum-VI, Corrigendum-VII, Corrigendum-VIII, Corrigendum-X, Corrigendum-XI, Corrigendum-XII, Corrigendum-XIII, Corrigendum-XIV, Corrigendum-XVCorrigendum-XVICorrigendum-XVII, Corrigendum-XVIII, Corrigendum-XIX, Corrigendum-XX, Corrigendum-XXI,

21st August 2017
105 Hiring of Vehicle on monthly rental basis for PIU - Dwarka- New Delhi

Bid document,

21st August  2017
106 Hiring of Vehicle on monthly basis for PIU- Hospet, Karnataka

NIQBid documentCorrigendum, Corrigendum-IICorrigendum-III

22nd August  2017
107 Hiring of Vehicle (AC-Commercial) on monthly rental basis for PIU-Dhule (MS) – Reg.

Bid document, Corrigendum-I,

22nd August  2017
108 Providing and Fixing Outdoor Overhead Hoardings (Flex) (5 No’s) having size 30 x 15 Sq.ft. (Km. 016.00 to km.166.00) Nagpur to Amravati Section of NH-53 (Old NH-6) (Location as selected by Competent Authority of NHAI) on Rent/ Lease basis (on NHAI land) - PIU- Amravati.

Bid document,

22nd August  2017 
109 Providing and Fixing Outdoor Overhead Hoardings (Flex) (5 Nos.) having size 30 ft. x 15 ft. (Between Km. 510.000 to Km 650.794) from Fagane to Maharashtra Gujarat Border Section of NH-6 and (Between Km. 168.500 to Km. 265.000) from Dhule to Palasner Section of NH- 3 (At locations as selected by Competent Authority of NHAI) on Rent / Lease basis- PIU-Dhule.

NIT, Bid document, Corrigendum-I,

22nd August  2017 
110 Providing and Fixing Outdoor Overhead Hoardings (Flex) (5 No’s) having size 30 x 15 Sq.ft. (Km. 94.00 to km.175.00) Nagpur to Hyderabad Section of NH-44 (Old NH-7) (Location as selected by Competent Authority of NHAI) on Rent/ Lease basis (on NHAI land) - PIU- Yavatmal.

Bid document,

22nd August  2017 
111 Providing and Fixing Outdoor Overhead Hoardings (Flex) (5 No’s) having size 30 x 15 Sq.ft. (Ch. 0.000 Km. To Ch. 244.369 Km.) Tuljapur-Ausa-Chakur-Loha-Loha- Warangaphata Section of NH-361 (Location as selected by Competent Authority of NHAI) on Rent/ Lease basis (on NHAI land) - PIU Nanded.

NIT, Bid document,

22nd August  2017 
112 Providing and fixing Outdoor Overhead Hoardings (OOH) (five nos.) (Flex) having size 30x15 Sq.ft. (Approx.) in Yedshi (Km 100.00) to Aurangabad (Km 290.200) (location as selected by Competent Authority of NHAI under PIU Aurangabad in the State of Maharashtra.

Bid document,

22nd August  2017 
113 Eastern Peripheral Expressway ITS Installation Project in the state of Uttar Pradesh/ Haryana.

NIT, Bid Vol-I , Bid Vol-II A, Bid vol-II B , Bid vol-III,

22nd August  2017(On e-Tendering Mode)
114 Consultancy Services for Appointment of Technical Consultant to Carry out the Detailed Project Report for Upgradation / Widening of Channrayapattana & Hassan Bypasses, 8 Grade separated Structures, Service Road and other Road Safety Measures essential in Devihalli(Km.110.00) to Hassan(km.189.500) section of NH 75, in the state of Karnataka.

NIT, RFP, Financial Bid-I, Financial Bid-II, Corrigendum-I, Modified Financial Bid-I, Modified Financial Bid-IIPre-bid meeting, Corrigendum-II, Corrigendum-III,

23rd August  2017(On e-Tendering Mode)
115 Hiring of Vehicle on monthly basis for PIU, Chennai.

Bid document

23rd August  2017
116 Construction of Service Road along with covered drain in Anantapur town limits on LHS from Km 357.150 to Km 357.510 by extension of existing Service Road on Hyderabad-Banglore Section of NH 44 in the state of Andhra Pradesh.

NIT, RFP, Financial Bid, E-tender Process,

23rd  August  2017(On e-Tendering Mode)
117 Independent Engineer (IE) Services for Operation and Maintenance stage under BOT mode of Existing Four Lane Jetpur Gondal Rajkot section from 117.600 to 185.000 on NH-8B in the state of Gujarat.

NIT, RFP, Integrity pact, Financial ProposalCorrigendum-IPre-bid reply, Corrigendum-II,

23rd  August  2017(On e-Tendering Mode)
118 Procurement and Installation of Office Furniture and Equipment for NHAI, PIU- Nanded (2nd Call)

NIQ, Bid documentBOQ

23rd August 2017 (On e-Tendering Mode)
119 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT VANTADA FEE PLAZA LOCATED AT KM 415.000 FOR THE SECTION FROM KM 388.180 TO KM 443.000 OF RATANPUR-HIMMATNAGAR ON NH-8 IN THE STATE OF GUJARAT.

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

23rd August  2017 (On e-Tendering Mode)
120 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT UNGUTURU FEE PLAZA AT KM 999.600 FOR THE SECTION FROM KM 950.283 TO KM 1022.494 (SIDDHANTHAM TO GUNDUGOLANU)OF NH-16 IN THE STATE OF ANDHRA PRADESH

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

23rd August  2017 (On e-Tendering Mode)
121 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT EETHAKOTA FEE PLAZA AT KM 946.300 FOR THE SECTION FROM KM 901.753 TO KM 950.283 (DIWANCHERUVU TO SIDDHANTHAM) OF NH-16 IN THE STATE OF ANDHRA PRADESH.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

23rd August  2017 (On e-Tendering Mode)
122 Consultancy Services for Preparation of DPR for Additional Cross Drainage structures across water tank areas i.e Bridges, Culverts etc on the basis of Order of NGT & Revised MoEF Clearance for the section of Kerala / Tamil Nadu border to Villukkuri section from km 43/0 to km 70/250 of NH-47 and Villukuri to Kanyakumari from Km. 70.250 to Km. 96.714 section of NH-47 & Nagercoil to Kavalkinaru from Km. 0.000 to Km. 16.376 section of NH-47B under NHDP Phase-III in the State of Tamil Nadu on EPC Mode.

RFP, Financial Proposal, Corrigendum-IReply to pre-bid Queries

23rd August  2017 (On e-Tendering Mode)
123 Providing and Fixing of Solar Blinkers, Marking of Thermoplastic Paint and Sign Boards at the specified locations for the stretch of Ichapuram- Srikakulam- Anandapuram - Visakhapatnam - Anakapalli section i.e. from Km 470.415 to 741.256 (length -270.841 Kms) of NH-16 (NH-5), in the state of Andhra Pradesh (2nd call).

NIT, Bid Vol-I, Bid Vol-II, Price Bid, MSME Order, E-tender Process,

23rd August  2017 (On e-Tendering Mode)
124 Quotation for hiring of hoarding on rent/lease on monthly basis, PIU- Warangal.

Bid document,

23rd August  2017
125 Hiring of hoardings on rent / lease on monthly basis-PIU-Nirmal.

Bid document,

23rd August  2017
126 Hiring of Hoarding Infrastructure including all it's accessories along National Highway No. 48 section of Vadodara to Bharuch from Km 108.700 to Km 198.000 in the state of Gujarat, PIU Bharuch 

Bid document,

24th August  2017
127 NHAI, PIU-Gandhidham invites hiring of Hoarding Infrastructure including all it's accessories along
1. National Highway No.27 from Km. 340.000 to Km. 677.000
2. National Highways 8A from Km. 254.000 to Km. 362.160
3. National Highways No. – 8A (Extn.) from Km. 0.000 to Km. 71.400

Bid document,

24th August  2017
128 Maintenance/ Improvement of Guwahati Bypass on NH-37 from Jalukbari to Koinadhara (Km 146.172 to Km 163.895) in the state of Assam (Total length 17.723 Km) in 2017. -- 2nd call

NIT, Bid Vol-I, Bid Vol-II, Financial Bid, BOQ, E-Tendering Procedure, Corrigendum-I,

24th August 2017 (On e-Tendering Mode)
129 Balance work for Four Laning of Bhopal- Biaora Section of NH-12 from km 324.00 to km. 423.400 in the State of Madhya Pradesh (Package –II) on EPC Mode

NIT, E-Tendering procedure, Corrigendum-I, Addendum-I, Addendum-II, Corrigendum-II, Addendum-III, Corrigendum-IVCorrigendum-V, Corrigendum-VII, Corrigendum-VIII, Corrigendum-IX, Corrigendum-X, Corrigendum-XI, Corrigendum-XII,

24th August 2017  (On e-Tendering Mode)
130 Consultancy Services for Preparation of Detailed Project Report (DPR) for Construction of new 6-lane Flyover at Ainthapalli Junction on NH-6 in Sambalpur

  RFP, Financial bid, Infracon operation procedure,

24th  August  2017(On e-Tendering Mode)
131 Survey and Valuation of affected structures, and any other value addition to the land, Building etc. within the proposed ROW of 4-“lanning of Punjab/Haryana Border to Jind Section of NH 71 (New NH-52/352) from Km. 238.695 to Km. 307.000 under NHDP-III in the State of Haryana on EPC mode”under PIU-Hisar in Jind Districts in the State of Haryana.

NITBid documentCorrigendum-I,

24th August  2017
132 Hiring of Vehicle (Yellow Board ) on monthly basis for NHAI - PIU, Warangal for one year.

Bid document,

24th August  2017
133 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT VANAGARAM at km 16.500 fee plaza located at Chennai Bypass Phase-I section from km 0.000 to km 19.170 (taking off at km 29.151 of NH-45 & merging at km 13.800 of NH-4), Chennai Bypass NH- 4 & 45) in the state of Tamil Nadu.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

24th August  2017 (On e-Tendering Mode)
134 Providing and Fixing Outdoor Overhead Hoardings (Flex) (5 No’s) having size 30 x 15 Sq.ft. 
( One No. each at following stretches).
(i) Nagpur -Betul Road km 137/00 to Km 257/00 of NH-47 (Old NH-69)
(ii) Nagpur -Betul Road km 3/00 to Km 59/00 of NH-47 (Old NH -69)
(iii) Nagpur-Jabalpur Road km/688/945 to km.679/00 of NH-44( Old NH-7)
(iv) Nagpur-Hyderabad Road km14/585 to 36/600 of NH-7
(v) Nagpur Bhandara Road km 544.200 to 498.000 of NH-53 (Old NH-6)
(Location as selected by Competent Authority of NHAI) on Rent/ Lease basis (on NHAI land).

Bid document,

24th August  2017
135 Hiring of Hoarding Infrastructure including all it's accessories along National Highway No. 59 (New NH-47) section of Ahmedabad-Godhra-Gujarat/MP Border from Km. 4+200 to Km. 215+900 (except Km. 122+420 to 129+300) in the state of Gujarat, PIU-Ahmedabad

NIQ

24th August  2017
136 Hiring of Hoarding Infrastructure including all it's accessories along National Highway No. 8 section of Ahmedabad to Vadodara from Km. 6+400 to Km. 108+700 and Ahmedabad-Vadodara Expressway (NE-1) from Km. 0+000 to Km. 93+302 in the state of Gujarat, PIU-Ahmedabad

NIQ

24th August  2017
137 Hiring of Hoarding infrastructure including all its accessories along National Highways, PIU-Surat: 
(i) Bharuch- Surat section of NH-48 (old NH-8) from km 198.00 to km 263.00 
(ii) Surat-Dahisar section of NH-48 (old NH-8) from km 263.00 to km 509.00 
(iii) Hazira - Surat to Maharashtra border section of NH-53 (old NH-6) from Km 0.000 to km 131.500.

NIQ, BOQ,

24th August  2017
138 Providing and Fixing Outdoor Overhead Hoardings (Flex) (15 Nos.) having size 30 ft. x 15 ft. Pune- Solapur section of NH-09 (New NH-65) Pkg. - II from Ch. 150.050 to Ch. 251.325, Solapur- Yedshi Section of NH-211 from Ch. 000.000 to Km. 100.000 and Solapur - Maharastra/ Karnataka Border section of NH-9 from Ch. 249.000 to km. 348.800 (Location as selected by Competent Authority of NHAI), PIU-Solapur.. (on NHAI land). 

NIQ

24th August  2017
139 Hiring of Hoarding Infrastructure including all it's accessories along National Highways No. NH 27 from Km. 0.000 to Km. 185.000 (Porbandar to Rajkot) NH-8D from Km. 0.00 to Km. 123.000 (Jetpur to Somnath) & NH-8A from Km. 183 to km. 253 ( Bamanbore to Garamore) in the state of Gujarat.

Bid document,

24th August  2017 
139 Independent Engineer services for Operation and Maintenance of Gorakhpur-Kasia- UP/Bihar border section of NH-228 from km. 279.800 to km. 360.915 (new ch. Km. 285.002 to km. 366.117) (Total Length = 81.115 km.) on OMT basis toll collection of Toll Plaza at km. 255.200 (New ch. Km 256.500) (For Toll collection of BOT Annuity reach from km. 251.700 to km. 279.800 (new Ch. km. 252.860 to km. 285.215) of Gorakhpur Bypass of NH-28 in the state of Uttar Pradesh on OMT basis. 

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V Corrigendum-VI, Revised Bid document, Corrigendum-VII,

25th August 2017  (On e-Tendering Mode)
140 Independent Engineer services for Operation and Maintenance of Ayodhya- Gorakhpur Section Border stretch of NH-28 in the State Uttar Pradesh (OMT Pkg-11) on OMT basis.

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-IIICorrigendum-IVReply to pre-bid QueriesRevised RFP Vol-IRevised RFP Vol-IICorrigendum-V, Corrigendum-VI, Revised Bid document, Corrigendum-VII,

25th August 2017  (On e-Tendering Mode)
141 Independent Engineer services for Operation & Maintenance of Allahabad Bypass (including Ganga Bridge Pkg. ABP-1) from Km. 158.00 to Km. 242.708 section of NH-2 in the State of U.P under OMT Pkg. 32.

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV, Corrigendum-V,  Corrigendum-VI, Revised Bid document, Corrigendum-VII,

25th August 2017  (On e-Tendering Mode)
142 Independent Engineer services for Operation & Maintenance of Kanpur-Lucknow (Km. 11.005 to Km. 75.500) stretch of NH-25 and Lucknow Bypass (Km. 0.00 to 22.850) stretch of NH-56A & 56B and Lucknow-Ayodhya Section (Km. 8.00 to km 137.970) stretch of NH-28 (Total length km 217.315) in the state of U.P. under OMT basis.

NITRFP, Corrigendum-I, Corrigendum-II, Corrigendum-III, Corrigendum-IV,  Corrigendum-VCorrigendum-VI, Revised Bid document, Corrigendum-VII,

25th August 2017  (On e-Tendering Mode)
143 6-laning of Kozhikode Bypass (Calicut Bypass) (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 (new NH-66) from design chainage km 230+400 to design chainage km 258.800 in the State of Kerala under NHDP Phase III on Hybrid Annuity mode.

NIT, E-Tender Process, RFP, DCA & Non Tech. Schedules, Technical Schedules, Executive Summary, DPR Vol I and II, DPR Vol III and IV, Bidding Document, Extension of Bid Due DateCorrigendum-II for extension of Bid due date, Pre-bid Reply, Modified Technical Schedules A B C D G, Modified Plan & Profile Drawings, Modified Structure Drawing, Updated Executive Summary, Corrigendum-III, Corrigendum-IV, Corrigendum-V, Revised Bidding Excel Sheet, Corrigendum-VI, Re-Revised Bidding Excel Sheet,

25th August 2017  (On e-Tendering Mode)
144 Providing, running, & maintenance of commercial vehicles on monthly hire basis for NHAI, PIU-Jodhpur.

NITBid document

25th August  2017
145 Appointment of Firm/agency for JMS & Valuation of structure falling within ROW for Four laining with paved shoulder of Naviganj- Mitrasen on NH-91 from Km. 289.000 to 356.000 Package -IV (Distt.-Kannauj)

NIQ, Bid Vol-I

25th August 2017 
146 Advertising Agencies for providing Hoardings on rent / lease basis along National Highways -Project Implementation Unit, Rourkela,

Bid document,

28th August  2017
147 Expression of Interest on Selection of Scheduled Commercial Banks for Regular Banking Accounts at NHAI Head Quarters.

Bid document

28th August  2017
148 Repair, Renovation & Painting of Office-cum- Residential Complex of NHAI, PIU-Durgapur.

NIT, Bid Vol-I, Bid vol-II

28th August  2017 (On e-Tendering Mode)
149 Consultancy Services for preparation of Detailed Project Report for upgradation of Guwahati Bypass from existing 4-Lane to 6-Lane Highway from Jalukbari to Koinadhora (Km. 146.172 to Km. 163.895) on NH-37 (New NH-27) in the state of Assam.

RFP

28th  August  2017(On e-Tendering Mode)
150 Consultancy Services for Authority’s Engineer for Supervision for Balance work for four-laning balance work for Lalghati (Bhopal) to Mubarakpur section of NH-12 from km. 315.725 to km. 324.00 (Package-I) in the State of MP on EPC mode. 

NITRFPProcedure under E-Tendering

28th  August  2017(On e-Tendering Mode)
151 Construction of New 4-Lane Bridge (2 x 12.5m wide twin two lane structures) over River Ganga at downstream of Farakka Barrage including approaches connecting Farakka-Raiganj section of NH-34 from Km 290.940 (Design Chainage 0.000 km) to Km 296.805 (Design Chainage 5.468 km) in the State of West Bengal on EPC mode.

NIT, RFP, EPC with Schedule, Integrity pact, Plan Profile, GAD & TCS, Corrigendum-I, Corrigendum-II, Reply to pre-bid queries, DPR, Geotechnical and Hydrology Report, Corrigendum-III, Corrigendum-IVCorrigendum-V, Reply to pre-bid Queries, CORRIGENDUM-V ANNEXURE-I, CORRIGENDUM-V ANNEXURE-II, CORRIGENDUM-VI, CORRIGENDUM-VII, CORRIGENDUM-VIII, CORRIGENDUM-IX, CORRIGENDUM-X, CORRIGENDUM-XICORRIGENDUM-XIICorrigendum-XIII, Corrigendum-XIV,

29th August 2017 (On e-Tendering Mode)
152 CAPACITY AUGMENTATION OF THE EXISTING 4 LANE STRETCH FROM ICHAPURAM TO NARASANNAPETA FROM KM 470.415 TO KM 580.700 (110.985 KM LENGTH) OF NH-16 (OLD NH-5) IN THE STATE OF ANDHRA PRADESH UNDER NHDP-V on EPC Mode

E-tender Process, NIT, RFP, Integrity Pact, EPC Agreement, Technical Schedule, Corrigendum-I, Corrigendum-VIIIModified Schedule, Corrigendum-IX, Corrigendum-X, Corrigendum-XI, Re-modified Technical Schedule, Corrigendum-XII, Corrigendum-XIII

29th August 2017 (On e-Tendering Mode)
153 Independent Engineer Services during Operation & Maintenance period for 6 laning of Panipat -Jalandhar section of NH-1 (New NH-44) from Km. 96.000 to Km.387.100 (Length 291.100 Km including balance work of about 10 Kms) in the State of Haryana & Punjab on BOT (Toll) basis on DBFOT pattern under NHDP Phase-V. 

RFPCorrigendum-I,

29th  August  2017(On e-Tendering Mode)
154 RFP for Four Laning of Solan Kaithlighat Section of NH-22 (Now NH-5) from km 106.139 to km 129.05 under NHDP Phase-III in the State of Himachal Pradesh on EPC mode.

NIT, RFP , E-tender Process, Corrigendum-I, Pre-bid Queries, Corrigendum-II, Corrigendum-III,

29th August  2017(On e-Tendering Mode)
155 Consultancy Services for preparation of Feasibility study /Detailed Project Report for construction of 2 lane with paved shoulder of Jatinga to Bara Narayanpur Section from km. 165.40 to km. 190.587 on NH – 54 of package AS-21(Bal) through New Alignment in the state of Assam on EPC mode.

RFP document Corrigendum-I,

29th August  2017(On e-Tendering Mode)
156 Advertising Agencies for installing Hoardings along National Highways, Project Implementations Unit, Keonjhar,

Bid document,

29th August  2017
157 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Pahammawlein Toll Plaza at Km. 13.550 (design ch.) (existing ch. 13.750) for section Jorbat-Shillong (Barapani) section of NH-40 from Km. 0.000 to Km. 61.840 in State of Meghalaya.

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

30th  August  2017(On e-Tendering Mode)
158 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT ALLONIA FEE PLAZA AT KM 584.500 FOR THE SECTION FROM 567.55 TO KM 624.48 (LAKHNADON-MAHGAON SECTION) ON NH-7 IN THE STATE OF MADHYA PRADESH.

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

30th  August  2017(On e-Tendering Mode)
159 Consultancy Services for preparation of Feasibility Report of construction of 4 Lane Inner Ring Road in and around Allahabad City in the state of Uttar Pradesh.

Bid document,

30th August  2017 (On e-Tendering Mode)
160 Survey and valuation of affected structures, and any other value addition to the land, Multi storied Building etc. including Joint Measurement with revenue Staff & land owners/ Sub-Holders, and submission to Competent Authority as per direction of Project director acquired width marking with paint on the buildings/ stone curve from the existing centre line.

Bid document,

30th August  2017
161 Hiring of 2 no's of vehicles on monthly basis for PlU, Thanjavur

Bid document, Corrigendum-I,

30th August  2017
162 Providing and Fixing Outdoor Overhead Hoardings (OOH) (5 No’s) (Flex) having size 30 x 15 Sq.ft.(450 Sq ft) Approx. at various Locations as selected by Competent Authority of NHAI along Beawar-Pali-Pindwara section of NH-14 from Km. 0.000 to km.244.120) under PIU- Jodhpur in the state of Rajasthan on rental basis beyond ROW.

NIT, Bid document,

31st August  2017 
163 Construction of Stand alone Ring Road/ Bypass around Jammu City (length 58.2 Km) on EPC Mode.

NITRFPTechnical ScheduleCorrigendum-ICorrigendum-II, Revised RFP & DCA, Schedules, Corrigendum-III, Corrigendum-IV, Corrigendum-VCorrigendum-VI, Corrigendum-VIICorrigendum-VIIICorrigendum-IX, Revised NIT, Revised RFP, Corrigendum-X, Reply to queries, Revised Schedule

31st August 2017(On e-Tendering Mode)
164 Hiring of One Innova Crysta Vehicle (White Colour) for Official Purpose of PIU Cochin.

NITFinancial BidTerm & Condition

30th August  2017
165 Office Accommodation for NHAI CALA Aurangabad Office.

Bid document

31st August  2017
166 Hiring of Hoarding Infrastructure including all it's accessories along with the following National Highways in the State of Haryana, PIU-Rohtak: 
1. Delhi/Haryana Border to Rohtak section of NH-10 (Km. 29.650 to Km. 93.140 ) 
2. Rohtak-Hisar section of NH-10 (from km.93.140 to km.191.950)
3. Rohtak Panipat Section of NH-71A (Km. 0.000 Km. 80.858) 
4. Rohtak-Bawal Section of NH-71 (km. 363.300 to km.445.853) 
5. Rohtak –Jind section of NH-71 (km. 307.00 to km.347.800) 

Bid document,

31st August  2017
167 Six laning of Narasannapeta - Ranastalam section of NH-16 (Old NH-5) from design Km.580.671 (Existing Km 580.700) to design Km.634.861 (Existing Km 634.000) (Design Length=54.19 Km) in the State of Andhra Pradesh under NHDP phase-V on Hybrid Annuity Mode.

RFP, DCA, Schedules, Plan & Profile, Main Report, Typical Cross section, Minor junction, Index Map, GAD & Drawing, Culvert drawings, HP culverts, e-tender process, Corrigendum-I, Corrigendum-VICorrigendum-VII, Corrigendum-VIIIBidding Sheet

1st September 2017 (On e-Tendering Mode)
168 Six laning & Strengthening of NH-248A from existing km 2.740 (Rajiv Chowk) to km 11.682 in Gurugram under NHDP Phase-IV in the State of Haryana on Hybrid Annuity Mode.

NIT, RFP, DCA & Non Technical Schedules, Technical Schedules, Schedule H Schedules, Drawings, Executive Summary, e-tender Process,

4th September  2017 (On e-Tendering Mode)
169 Expression of Interest for Publishing of NH Atlas

Bid document,

4th September  2017
170 Six Laning of Bangalore-Nidagatta Section km. 18.000 to km. 74.200 of NH -275 in the State of Karnataka to be executed on Hybrid Annuity Mode.

NIT, RFP, MCA, Schedule, Corrigendum-V, Corrigendum-VII, Corrigendum-VIII, Revised NIT, Revised RFP, Revised e-tendering, Bidding Excel

4th September  2017(On e-Tendering Mode)
171 Six- Laning from Nidagatta-Mysore Section from km 74.200 to km 135.304 of NH-275 in the State of Karnataka to be executed on Hybrid Annuity Mode.

NIT, RFP, MCA, Schedule, Corrigendum-V, Corrigendum-VII, Corrigendum-VIII, Revised NIT, Revised RFP, Revised e-tendering, Bidding Excel

4th September  2017(On e-Tendering Mode)
172 Independent Engineer services for Supervision of Six laning of Narasannapeta - Ranastalam section of NH-16 (Old NH-5) from design Km.580.671 (Existing Km 580.700) to design Km.634.861 (Existing Km 634.000) (Design Length=54.19 Km) in the State of Andhra Pradesh under NHDP phase-V on Hybrid Annuity Mode.

NIT, RFP

5th  September  2017(On e-Tendering Mode)
173 Command and Control Centre including Video Conference, CCTV Surveillance & Monitoring of Vehicular Congestion on National Highway Toll Plazas.

NITRFPCorrigendum-I, Corrigendum-II, Revised RFP, Corrigendum-III, Corrigendum-IVCorrigendum-VCorrigendum-VI, Corrigendum-VII,

6th September 2017  (On e-Tendering Mode)
174 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Rasoiyadhamna Fee Plaza at Km. 279.425 Barachatti – Gorhar section from Km. 240.000 to Km. 320.000 of NH-2 in the state of Jharkhand.

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

6th September  2017 (On e-Tendering Mode)

 

175 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT LEMBALAKUDI fee plaza at km 57.317 on Trichy to Karaikudi Section from km 54.800 to km 91.054 (Design kilometer) of NH -210 in the state of Tamil Nadu.

NITRFPFinancial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

6th September  2017 (On e-Tendering Mode)

 

176 Consultancy Services for Independent Engineer services for Six-laning of Kozhikode Bypass (Calicut Bypass) (i.e. Vengalam Jn. to Ramanattukara Jn.) section of NH-17 (new NH-66) from D. Ch. km 230+400 to D. Ch. km 258.800 (total length 28.400 km) in the State of Kerala on Hybrid Annuity Mode.

NIT, RFP, Financial Bid, Corrigendum-ICorrigendum-II, Corrigendum-III, Corrigendum-IV,

6th September 2017 (On e-Tendering Mode)
177 PROVISION OF CONTROL CENTRE SERVICES FOR TRAFFIC SURVEY ON HIGHWAYS- IHMCL

Bid document,

7th September  2017
178 Request for Annual Pre-Qualification (RFAQ) - 2017 for the works to be taken up on EPC mode during 2017-18

NIQ, RFAQ, Corrigendum-I, Corrigendum-II

7th September 2017 (On e-Tendering Mode)
179 Authority’s Engineer for Supervision of Construction of Stand alone Ring Road / Bypass around Jammu City in the state of J&K (4 Lane, Length -58.2Km) on Engineering Procurement and Construction (EPC) Basis.

NITRFP, Letter to bidders, Corrigendum-I, Corrigendum-II, Reply to pre-bid Queries,  Corrigendum-III, Corrigendum-IV,

7th September 2017  (On e-Tendering Mode)
180 Consultancy Services to carry out detailed technical assessment of the corridors to identify issues impacting the efficiency of the corridors and its design solutions.

Bid document, Instructions to Applicants,

8th September  2017 (On e-Tendering Mode)
181 COLLECTION OF USER FEE THROUGH FEE COLLECTING AGENCY ON THE BASIS OF COMPETITIVE BIDDING ON E-TENDER BASIS AT Etturvattam Fee Plaza at km 74.930 (Length 64.200 km) for the Section from km 0.000 to km 283.170 (Madurai – Tirunelveli – Panagudi - Kanyakumari Section) on NH – 7 in the State of Tamil Nadu.

NIT, RFP, Financial Bid, Policy CircularAmendment RFP RFQLetter to Toll ContractorBus and Truck Bifurcation,

11th September  2017 (On e-Tendering Mode)
182 Consultancy Services for Authority’s Engineer for Supervision for balance work for four laning of Obedullaganj to Itarsi Section of NH-69 from km. 2.800 to km. 8.300 and from km. 20.700 to km. 63.000 (Design Length 46.3 km.), excluding km. 8.300 to 20.700 Wild Life Area, in the state of Madhya Pradesh (Package-I) on EPC Mode.

NIT, RFP,

11th September  2017 (On e-Tendering Mode)
183 Construction of 4-lane Road on NH-12 (New NH-52) from Km 299.000 to 346.540 (Design Chainage From 9.860 to 58.740) (Darah-Jhalawar-Teendhar section) in the State of Rajasthan under NHDP Phase-III on Hybrid Annuity Mode (Length 48.880 Km.) – Package II.

NITRFPFinancial BidScheduleDCA & ScheduleProcedure under E-Tendering

11th  September  2017(On e-Tendering Mode)
184 Consultancy services for i) Bhubaneswar (km 435.498) –Ichhapuram (km 620.430) section of NH-16 in the state of Odisha and ii) Chandikhole (Km.0.000) – Paradip (Km.77.000) section of NH-5A in the state of Odisha.

RFP,

11th September  2017 (On e-Tendering Mode)
185 Rehabilitation and Augmentation of 4-laning of Barhi-Koderma Section of NH-31 from Km. 0.000 to Km. 27.500 in the State of Jharkhand under NHDP Phase-IV

NITBid Vol-IBid Vol-IIFinancial BidDPRScheduleIntegrity pactDrawings, E-Tendering

13th  September  2017(On e-Tendering Mode)
186 Construction of 4-Lane Flyover at Km.80.742 from Km 79.780 to Km 81.200 (Length - 1.420 Km) of NH-3 at Morena Town in the State of Madhya Pradesh on EPC Mode.

NIT, Bid document, E-tender process,

13th September  2017 (On e-Tendering Mode)
187 Four Laning of Loha –Waranga section of NH-361 from km 176.800 to km 244.369 (design length 67.569 km) under NH(O) in the State of Maharashtra on Hybrid Annuity Mode.

NIT, RFP, Technical Schedules, DCA, E-tender processCorrigendum-I, Reply to pre-bid queries, Appendix-I, Corrigendum-II, Corrigendum-III, Corrigendum - IV,

14th September 2017 (On e-Tendering Mode)
188 Six laning of Anandauram–Pendurthi-Anakapalli section of NH-5 (new NH-16) from Km.681.000 (Existing Km.681.000) to Km.731.780 (Existing Km.742.400) along with four lane connectivity to Visakhapatnam Port Road from Km.0.000 to Km.12.700 (Design Length=63.48 Km) in Andhra Pradesh on Hybrid Annuity Mode.

NIT & RFP, Concession Agreement, Schedules , Integrity pact, E-tender process, Corrigendum-ICorrigendum-IICorrigendum-III, Corrigendum-IV, DCA, Schedules, Corrigendum-V, Corrigendum-IXCorrigendum-X

15th September 2017 (On e-Tendering Mode)
189 Tender for Facility Services in NHAI’s Corporate Office, New Delhi

Technical Bid, Financial Bid,

15th September  2017 (On e-Tendering Mode)
190 Survey and Valuation of affected structures, and any other value addition to the land, Buildings etc. within the Proposed ROW of the work of Four laning of Pinjore -Baddi-Nalagarh section Km 17.930 to Km 35.312 (design chainage) of NH-21A in the state of Himachal Pradesh (Estimated Cost Rs. 27,16,000).

NITBid document

18th September  2017
191 Special Repair/Maintenance of existing UP/Haryana Border to Sonepat- Jhajjar Section from km.52.860 to km.132.850 of NH-334 B in the State of Haryana.

NIT, Bid Vol-I, Bid Vol-II, BOQ

18th September  2017 (On e-Tendering Mode)
192 NHAI has been assigned the work of Consultancy Services for Preparation of Pre-Feasibility Study of Delhi-Yamunanagar Expressway having an approximate length of 180 Km (the "Project").

NIT, RFP, Financial Bid, Letter to bidders, Integrity pact

18th September  2017 (On e-Tendering Mode)
193 Independent Engineer Services during Operation & Maintenance Period for 4-laned Nagpur –Kondhali (Km.9.200 to Km.50.000) Section of NH-53 (Old NH-6) in the State of Maharashtra on BOT basis - Consultancy Package No.IE-O&M/NH-53/NAG-6

NIT, Bid Vol-I, Bid Vol-II,

19th September  2017 (On e-Tendering Mode)
194
 Sl. No.

Name of the Wayside Amenities

1 Construction and Operation of Wayside Amenities at Km 19+600 (on both sides RHS + LHS), NH-7, near Dongargaon Village, Nagpur - Pandharkawada Section, Nagpur Dist., Maharashtra. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/MH/Phase 1/NH 7/ 377) 
2 Construction and Operation of Wayside Amenities at Km 158+700 (RHS), NH-49, Ramanathapuram - Rameswaram Section, Pamban Village, Rameswaram Taluk, Ramanathapuram Dist., Tamil Nadu. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/TN/Phase 1/NH 49/ 180) 
3 Construction and Operation of Wayside Amenities at Km 243+170, NH-7, Madurai to Kanniyakumari Section, Road End, Kanniyakumari Dist., Tamil Nadu. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/TN/Phase 1/NH 7/ 95) 
4 Construction and Operation of Wayside Amenities at Km 387+388 (LHS), NH-7, Anantapur - Bangalore Section, Regatipalli Village, Dharmavaram, Anantapur Dist., Andhra Pradesh under BOT Mode (Build, Operate and Transfer) (Package No: WSA/AP/Phase 1/NH 7/ 335) 
5 Construction and Operation of Wayside Amenities at Km 77+800 (RHS), NH-7, Hosur - Krishnagiri Section, Kurubarapalli village, Krishnagiri Dist., Tamil Nadu. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/TN/Phase 1/NH 7/ 352) 

NIT, E-tendering Process, RFP, DCA, Consolidated Data Sheet, Data Reports, Layout, Drawings, Financial Bid, Schedule,

20th  September  2017(On e-Tendering Mode)
195 Operation & Comprehensive Maintenance of D.G. Sets And Electrical Equipments & Electrical Installations at NHAI HQ Building, G-5&6, Sector-10, and MTNL Building, Sector-19 Dwarka, New Delhi.

Bid Vol-I, Bid Vol-IIBOQ

21st September  2017 (On e-Tendering Mode)
196 Consultancy Services for preparation of DPR for bypass/ring roads around Gorakhpur, Bareilly, Moradabad, Kanpur and Ayodhya in the State of Uttar Pradesh under NHDP Phase-VII.

NIT, RFP, Financial Bid, Infracon Operation Procedure, e-tender Process

22nd September  2017 (On e-Tendering Mode)
197 Construction of Road Tunnel, viaduct and Churhat Bypass of Rewa Sidhi Section of NH 75E from Chainage 33.200 to Chainage 55.400 (Design Length 15.350 km.) as Cement Concrete Pavement configuration in the State of Madhya Pradesh on design, build, operate and transfer (the “DBOT Annuity” or “Hybrid Annuity”) basis. 

NIT, RFP, DCAE-Tender Process,  

25th September  2017 (On e-Tendering Mode)
198 Construction of Six lane Vadodara Kim Expressway from Km 355.00 to Km 378.740 (Padra to Vadodara Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA-Package I)

NIT, RFP, Financial BidEPC Agreement, E-Tendering processDrawingsSchedules

25th September  2017 (On e-Tendering Mode)
199 Construction of Six lane Vadodara Kim Expressway from Km 323.00 to Km 355.00 (Sanpa to Padra Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA-Package II)

NIT, RFPFinancial BidEPC Agreement, E-Tendering process, DrawingsSchedules

25th September  2017 (On e-Tendering Mode)
200 Construction of Six lane Vadodara Kim Expressway from Km 292.00 to Km 323.00 (Manubar to Sanpa Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA-Package III)

NIT, RFPFinancial BidEPC Agreement, E-Tendering process, DrawingsSchedules

25th September  2017 (On e-Tendering Mode)
201 Construction of Six/Eight lane Vadodara Kim Expressway from Km 279.00 to Km 292.00 (Ankleshwar to Manubar Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI on EPC mode (Phase IA-Package IV)

NIT, RFP, Financial BidDCA, Non Technical Schedules, E-Tendering process, DrawingsSchedules,  

25th September  2017 (On e-Tendering Mode)
202 Construction of Eight lane Vadodara Kim Expressway from Km 254.430 to Km 279.000 (Kim to Ankleshwar Section of Vadodara Mumbai Expressway) in the State of Gujarat under NHDP Phase - VI (Phase IA – Package V) on EPC mode.

NIT, RFP, Financial BidEPC Agreement, E-Tendering processDrawingsSchedules

25th September  2017 (On e-Tendering Mode)
203 Construction of balance Works of Six Laning of Jaipur Ring Road (Km 0+300 to Km 46+700) between Agra Road and Ajmer Road Section in the State of Rajasthan on Engineering, Procurement & Construction (EPC) Mode

RFP, DCA, Executive summary, E-Tender Process, Schedules, Revised Schedule CRevised Schedule H,  

26th September  2017 (On e-Tendering Mode)
204
 Sl. No. Name of the Wayside Amenities
i Construction and Operation of Wayside Amenities at Km 502+640 (RHS), NH-7, Anantapur - Bangalore Section, Harobande Village, Chikkaballapura Dist., Karnataka. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/KA/Phase 1/NH 7/ 343) 
ii Construction and Operation of Wayside Amenities at Km 336+530 (RHS), NH-13, Hospet - Chitradurga Section, Kudligi Town, Bellary Dist., Karnataka under BOT Mode (Build, Operate and Transfer) (Package No: WSA/KA/Phase 1/NH 13/ 3)
 
iii Construction and Operation of Wayside Amenities at Km 292+480 (LHS), NH-63, Hospet- Bellary Section, Papinayakanhalli Village, Bellary Main Road, Hospet Taluk, Bellary Dist., Karnataka under BOT Mode (Build, Operate and Transfer) (Package No: WSA/KA/Phase 1/NH 63 / 309) 
iv Construction and Operation of Wayside Amenities at Km 389+396 (LHS), NH-13, Hospet - Chitradurga Section, Donehalli, Devanagare Dist., Karnataka under BOT Mode (Build, Operate and Transfer) (Package No: WSA/KA/Phase 1/NH 13/ 4)
 
v Construction and Operation of Wayside Amenities at Km 457+648 (LHS), NH-4, Dharwad - Belgaum Section, Kittur Taluk, Belgaum Dist, Karnataka under BOT Mode (Build, Operate and Transfer) (Package No: WSA/KA/Phase 1/NH 4/5) 
vi Construction and Operation of Wayside Amenities at Km 589+731 (LHS), NH-4, Belgaum - Maharashtra Border Section, Koganoli village, Chikkodi Taluk, Belgaum Dist., Karnataka. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/KA/Phase 1/NH 4/6)

NIT, E-tendering Process, RFP, DCA, Consolidated Data Sheet, Data Reports, Layout, Drawings, Financial Bid, Schedule,

26th  September  2017(On e-Tendering Mode)
205
 Sl. No. Name of the Wayside Amenities
i Construction and Operation of Wayside Amenities at Km 123+000 to 123+200 (RHS), NH-25 (New NH-27), Jhansi - Orai Section, Gulara Village, Moth Tehsil, Jhansi Dist., Uttar Pradesh. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/UP/Phase 1/NH 25/ 198) 
ii Construction and Operation of Wayside Amenities at Km 433+510 to 433+688 (LHS), NH-2, Kanpur to Itawah Section,, Sahzadpur, Akbarpur, Kanpur Dehat, Uttar Pradesh. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/UP/Phase 1/NH 2/ 381) 
iii Construction and Operation of Wayside Amenities at Km 1194+300 (RHS) (old km 502 of NH 76), NH-27, Baran-Shivpuri-Jhansi Section, Pahadi Village, Kelwada Sub-Tehsil, Sahabad Tehsil, Baran Dist., Rajasthan. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/RJ/Phase 1/NH 27/ 34) 
iv Construction and Operation of Wayside Amenities at Km 1227+200 (LHS) (old km 535 of NH 76), NH-27, Baran - Shivpuri - Jhansi Section, Khushahadpura Village, Sahabad Tehsil, Baran Dist., Rajasthan. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/RJ/Phase 1/NH 27/ 35) 
v Construction and Operation of Wayside Amenities at Km 192+600 (LHS), NH-28, Lucknow-Muzaffarnagar Section, Futahia, Basti Dist., Uttar Pradesh. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/UP/Phase 1/NH 28/ 397) 
vi Construction and Operation of Wayside Amenities at Km 192+600 (RHS), NH-28, Lucknow - Muzaffarnagar Section, Futahia, Basti Dist., Uttar Pradesh. under BOT Mode (Build, Operate and Transfer) (Package No: WSA/UP/Phase 1/NH 28/ 398) 
vii Construction and Operation of Wayside Amenities at Km 893+000 of NH 27 (Old at Km 201+000 Junction of NH-76 and NH-79), Chittorgarh Bypass Section, Chittorgarh, Rajasthan under BOT Mode (Build, Operate and Transfer) (Package No: WSA/RJ/Phase 1/NH 76/ 323)

NIT, E-tendering Process, RFP, DCA, Consolidated Data Sheet, Data Reports, Layout, Drawings, Financial Bid, Schedule,

25th  September  2017(On e-Tendering Mode)
Request For Annual Qualification for Public Private Partnership in National Highways Projects for the year 2014.
NIT , RFAQCorrigendum No 1Reply to Queries of RFAQ-2014
Request For Annual Qualification for Public Private Partnership in National Highways Projects.
NIT , RFAQ, Letter, Modified RFAQ, Amendment No. 1, Modified RFAQ-31.03.2011 ,Reply to Queries, Amendment No. 2,Extension of due datePreliminary Evaluation of RFAQAmendment , Amendment to Clarification

User Fee (Toll) Collection at Toll Plazas of NHAI -Pre-Qualification of Contractors.

1. RFQ dated 22.09.2016 of NHAI,  Corrigendum, Addendum-I,

2. Details of Fee Plazas of NHAI as on 20.12.201614.07.2017,

3. List of Applicants pre-qualified (Category-1): Page-1 , Page-2 Page-3 Page-4 , Page-5 , Page-6 , Page-7 , Page-8, Page-9, Page-10, Page-11, Page-12, Page-13, Page-14, Page-15, Page-16, Page-17, Page-18, Page-19, Page-20, Page-21, Page-22, Page-23, Page-24, Page-25, Page-26, Page-27, Page-28, Page-29, Page-30, Page-31, Page-32Page-33Page-34, Page-35, Page-36, Page-37, Page-38, Page-39, Page-40Page-41Page-42

4. List of Applicants pre-qualified (Category-2):   Page-1  Page-2 Page-3 , Page-4 , Page-5 , Page-6Page-7, Page-8, Page-9, Page-10, Page-11, Page-12, Page-13, Page-14, Page-15, Page-16, Page-17, Page-18, Page-19, Page-20, Page-21, Page-22, Page-23, Page-24, Page-25, Page-26, Page-27, Page-28, Page-29, Page-30, Page-31, Page-32, Page-33, Page-34, Page-35Page-36Page-37Page-38Page-39Page-40,  Page-41, Page-42, Page-43,

5. List of Applications Received dated: 17.10.2016 , 25.10.2016 , 28.10.2016 , 2.11.2016, 16.11.2016, 17.11.201618.11.2016, 21.11.2016, 22.11.2016 24.11.2016, 28.11.2016, 30.11.2016, 01.12.2016, 05.12.201606.12.201607.12.2016, 08.12.2016, 13.12.201619.12.201621.12.201623.12.2016,  29.12.201605.01.201706.01.201709.01.201712.01.201713.01.2017, 18.01.201725.01.2017,  30.01.201706.02.2017, 07.02.201708.02.2017, 09.02.2017, 14.02.2017, 15.02.2017, 17.02.2017, 23.02.2017, 01.03.2017, 03.03.2017, 06.03.2017, 07.03.2017, 15.03.2017, 17.03.2017, 24.03.2017, 07.04.2017, 25.04.2017, 26.04.2017, 28.04.2017, 02.05.2017, 12.06.2017, 21.06.201727.06.201705.07.201706.07.201714.07.201717.07.2017, 25.07.2017, 28.07.2017, 31.07.2017, 08.08.2017, (ii)8.08.2017, 14.08.2017, 16.08.2017, 17.08.2017,
 

User Fee (Toll) Collection at Toll Plazas of NHAI -Pre-Qualification of Contractors.

1. RFQ dated 14.09.2015 of NHAIAddendum to RFQ dated 14.09.2015, 

2. Details of Toll Plazas of NHAI:- Dated 03.02.2016 , 02.06.201616.09.2016

3. List of Applicants pre-qualified (Category-1): Page-1 , Page-2Page-3, Revised Page-3, Page-4, Page-5, Page-6, Page-7, Page-8, Page-9, Page-10, Page-11, Page-12Page-13, Page-14, Page-15, Page-16, Page-17Page-18Page-19, Page-20, Page-21, Page-22, Page-23, Page-24, Page-25, Page-26, Page-27, Page-28, Page-29, Page-30 , Page-31 , Page-32, Page-33, Page-34, Page-35, Page-36, Page-37, Page-38

4. List of Applicants pre-qualified (Category-2): Page-1 , Page-2Page-3, Page-4, Page-5, Page-6Page-7 Page-8, Page-9, Page-10, Page-11, Page-12, Page-13, Page-14, Page-15, Page-16, Page-17, Page-18, Page-19, Page-20, Page-21, Page-22,Page-23, Page-24, Page-25, Page-26, Page-27, Page-28, Page-29, Page-30, Page-31, Page-32, Page-33Page-34Page-35, Page- 36Page -37 Page-38 Page-39 Page-40 Page-41Page-42Page-43 Page-44 

5. List of Applications Received dated: 06.10.2015 , 13.10.2015, 14.10.2015, 20.10.2015, 30.10.2015, 06.11.2015, 10.11.201517.11.2015, 20.11.2015, 26.11.2015, 30.11.2015, 1.12.2015, 2.12.2015, 3.12.2015, 8.12.2015, 10.12.2015, 11.12.2015, 14.12.2015, 15.12.2015, 16.12.2015, 21.12.2015, 28.12.2015, 30.12.2015, 06.01.2016, 07.01.2016, 08.01.2016, 12.01.201618.01.201619.01.201620.01.2016, 25.01.2016, 27.01.2016, 28.01.2016, 29.01.2016, 01.02.2016, 03.02.201604.02.201605.02.201608.02.201609.02.2016, 11.02.2016, 17.02.2016, 22.02.2016, 25.02.2016, 14.03.2016, 8.04.2016,   13.04.2016,   29.04.2016, 03.05.2016, 04.05.2016, 16.05.201624.05.2016 30.05.201631.05.2016 08.06.201610.06.2016 22.06.2016 27.06.2016 06.07.2016 14.07.2016 2.08.2016 8.08.2016 , 16.08.2016, 18.08.2016 , 22.08.2016, 24.08.2016, 31.08.2016, 05.09.2016, 07.09.2016, 15.09.2016, 31.10.2016, 2.11.2016, 23.11.2016, 13.12.2016

 

RFQ dated 10.09.2014 of NHAIAddendum to RFQ dated 10.09.2014,

Reply to query of bidders dated: 25 09 2014:  

Details of Toll Plazas of NHAI, dated 14.01.2015 , 5.08.2015 ,

List of Applicants pre-qualified (Category-1): Page-1, Page-2, Page-3, Page-4, Page-5, Page-6, Page-7, Page-8, Page-9, Page-10, Page-11, Page-12, Page-13, Page-14, Page-15, Page-16, Page-17, Page-18, Page-19, Page-20, Page-21, Page-22, Page-23Page-24, Page-25, Page-26, Page-27, Page-28Page-29, Page-30, Page-31Page-32

List of Applicants pre-qualified (Category-2): Page-1Page-2, Page-3, Page-4, Page-5, Page-6, Page-7, Page-8, Page-9, Page-10, Page-11, Page-12, Page-13, Page-14, Page-15, Page-16, Page-17, Page-18, Page-19, Page-20, Page-21, Page-22, Page-23, Page-24Page-25Page-26Page-27, Page-28, Page-29, Page-30, Page-31, Page-32Page-33, Page-34, Page-35Page-36, Page-37, Page-38, Page-39, Page-40, Page-41, Page-42, Page-43, Page-44, Page-45,

List of Applications Received dated: 26.11.2014 , 4.12.2014, 8.12.2014, 15.12.2014, 22.12.2014, 26.12.2014, 6.01.2015 , 7.01.2015, 9.01.2015, 14.01.2015, 16.01.2015, 20.01.2015, 21.01.2015, 22.01.2015, 02.02.2015, 04.02.2015 , 05.02.2015 , 10.02.2015,  18.02.2015, 24.02.2015, 02.03.2015, 03.03.2015, 09.03.2015, 17.03.2015, 23.03.20157.04.2015,  9.04.2015, 13.04.2015, 23.04.2015, 12.05.2015, 14.05.2015, 2.06.2015, 5.06.2015, 11.06.2015, 12.06.2015, 9.07.2015, 17.07.2015, 22.07.2015, 24.07.2015, 31.07.2015, 11.08.2015, 17.08.2015, 2.09.2015, 4.09.2015,   18.09.201514.10.2015, 1.12.2015, 9.12.2015,

 

 RFQ dated 21.10.2013 of NHAI , Corrigendum - I  to RFQ dated 21.10.2013 , Corrigendum - II   dated 16.01.2014 ,Corrigendum -III  dated 13.03.2014,  Details of Toll Plazas of NHAI , Details of Toll Plazas of NHAI dated 08.07.2014 , List of Applications received, List of Applicants pre-qualified (Category-1), Page-2(Category-1) ,  Page-3(Category-1) ,Page-4(Category-1) ,Page-5(Category-1) ,Page-6(Category-1),Page-7(Category-1) , Page-8(Category-1) , Page-9(Category-1) , Page-10(Category-1) ,Page-11(Category-1) , Page-14(Category-1) , Page-15(Category-1) , Page-16(Category-1) , Page-17(Category-1) , Page-18(Category-1) , Page-19(Category-1) ,  List of Applicants pre-qualified (Category-2) , Page-2(Category-2) ,Page-3(Category-2) ,Page-4(Category-2) ,Page-5(Category-2) , Page-6(Category-2) , Page-7(Category-2),Page-8(Category-2), Page-9(Category-2), Page-10(Category-2), Page-11(Category-2), Page-12(Category-2),Page-13(Category-2), Page-14(Category-2) ,Page-15(Category-2) , Page-16(Category-2), Page-17(Category-2) , Page-18(Category-2) ,Page-19(Category-2),  Page-20(Category-2), Page-21(Category-2), Page-22(Category-2), Page-23(Category-2), Page-24(Category-2),  Page-25(Category-2),  Page-26(Category-2),  Page-27(Category-2), Reply to query of bidders dated 06.11.2013 , Reply to query of bidders dated 20.11.2013 , Reply to query of bidders dated 12.12.2013 , Reply to query of bidders dated 28.01.2014 , List of Application Received Dated 27.11.2013 , List of Application Received Dated 29.11.2013 , List of Application Received Dated 03.12.2013  , List of Application Received Dated 05.12.2013  , List of Application Received Dated 11.12.2013  , List of Application Received Dated 19.12.2013 , List of Application Received Dated 06.01.2014  , List of Application Received Dated 31.01.2014 , List of Application Received Dated 12.02.2013 , List of Application Received Dated 20.02.2013 , List of Application Received Dated 26.02.2013 ,List of Application Received Dated 24.04.2014 ,List of Application Received Dated 15.05.2014,List of Applications received Dated 27.05.2014 ,List of Applications received Dated 24.06.2014 ,List of Applications received Dated 14.07.2014 ,List of Applications received Dated 22.07.2014 ,List of Applications received dated 28.07.14 , List of Applications received Dated 05.08.2014 , List of Applications received Dated 13.08.2014 , List of Applications received Dated 27.08.2014 , List of Applications received Dated 1.09.2014 , List of Applications received Dated 10.09.2014 , List of Applications received Dated 17.09.2014 , List of Applications received Dated 23.09.2014 , List of Applications received Dated 29.10.2014 , List of Applications received Dated 12.11.2014, List of Applications received Dated 26.11.2014 , List of Applications received Dated 04.12.2014

Invitation of RFP/Financial Bids for Toll Collection at Toll Plazas of NHAI

 Invitation of RFP/Financial Bids for Toll Collection , Invitation of RFP/Financial Bids for Toll Collection-II , Invitation of RFP/Financial Bids for Toll Collection-III , Invitation of RFP/Financial Bids for Toll Collection-IV  , Invitation of RFP/Financial Bids for Toll Collection-V

Request For Proposal (RFP) ,Corrigendum-I , Revised-Invitation of RFP/Financial Bids for Toll Collection, Corrigendum-II , Corrigendum-III dated 09 07 2014Addendum-IAddendum dated 17.07.2015Addendum dated 29.05.2015Addendum dated 19.04.2016Important Notice dated 24.03.2017,

Record of Financial Bids on due date 11 12 2013 12 12 2013 , 13 12 2013 , 16 12 2013 , 17 12 2013 , 31 12 2013 , 3 01 2014 , 8 01 2014 , 10 01 2014 , 15 01 2014 , 16 01 2014 ,(i) 17 01 2014 , (ii) 17 01 2014 ,20 01 2014 24 01 2014 30 01 2014 , Record of Financial Bids on due date 31 01 2014 04.02.2014 06.02.2014 07.02.2014 11.02.2014 12.02.2014 , (i)  13.02.2014 , (ii)  13.02.2014 , 14.02.2014 17.02.2014 18.02.2014 ,  21.02.2014  ,  26.02.2014 28.02.2014 , (i)  03.03.2014 , (ii)  03.03.201405.03.2014 , 06.03.2014(i) 07.03.2014 , (ii)  07.03.2014 , (i) 10.03.2014(ii) 10.03.201411.03.2014 , 12.03.201414.03.2014 , 18.03.2014 , 19.03.2014 , 21.03.2014 , 27.03.2014 , 02.04.2014 , 04.04.2014 07.04.2014 , (i) 09.04.2014 , (II) 09.04.2014 , (i) 11.04.2014 , (ii) 11.04.2014 15.04.2014 , 16.04.2014 , 17.04.2014 , (i)  23.04.2014 , (ii) 23.04.2014 25.04.2014 , 30.04.2014 01.05.2014 ,   02.05.201419.05.2014 , (i)  22.05.2014 , (ii)  22.05.2014 , (I) 23.05.2014 , (ii)  23.05.2014 , (i) 26.05.2014 , (ii) 26.05.201427.05.2014 , (i) 28.05.2014 ,(ii)  28.05.2014, 30.05.2014, (i) 02.06.2014(ii) 02.06.2014(i)  03.06.2014(ii)  03.06.2014 , 04.06.2014 06.06.2014 09.06.2014 , (i) 10.06.2014 , (ii) 10.06.2014 13.06.2014 , (i) 16.06.2014 , (ii)  16.06.2014 , (iii) 16.06.2014 17.06.2014 , 18.06.2014(i)  20.06.2014 , (ii) 20.06.2014 , (iii)  20.06.2014 25.06.201430.06.2014 01.07.2014 02.07.2014 , 03.07.2014(i) 04.07.2014 , (ii) 04.07.2014 , (iii)  04.07.2014 07.07.201408.07.201414.07.201415.07.201417.07.2014 21.07.2014 ,   24.07.2014(i)  28.07.2014(ii)  28.07.2014(iii) 28.07.2014 31.07.2014 01.08.2014 , (i) 04.08.2014 , (ii) 04.08.2014 07.08.2014 , 11.08.201412.08.2014 , 13.08.2014 14.08.2014 , (i) 19.08.2014 , (ii) 19.08.2014 , (i) 20.08.2014 , (ii)  20.08.2014 , (i) 25.08.2014 , (ii)  25.08.2014 , 1.09.2014 5.09.2014 , 10.09.2014 , 16.09.201417.09.201424.09.2014(i)  29.09.2014(ii) 29.09.2014(i) 30.09.2014(ii) 30.09.2014(i) 07.10.2014(ii) 07.10. 2014 , 17.10. 2014(i)  20.10. 2014(ii)  20.10. 2014(iii)  20.10. 2014(iv) 20.10. 201421.10. 2014 , 24.10. 2014(i) 27.10. 2014 , (ii)  27.10. 2014 ,   28.10. 2014  29.10. 2014  5.11. 2014  11.11. 2014(i)   12.11. 2014(ii) 12.11. 2014(i)  13.11. 2014(ii) 13.11. 2014(i)  14.11. 2014(ii)  14.11. 2014 18.11. 2014(i)  20.11. 2014(ii)  20.11. 2014 21.11. 2014  ,  25.11. 2014 26.11. 2014 27.11. 2014, (i) 28.11. 2014(ii)  28.11. 2014 01.12. 2014 03.12. 2014 04.12. 2014 05.12. 2014, (i)  08.12. 2014, (ii) 08.12. 2014 11.12. 2014, (i) 12.12. 2014, (ii)  12.12. 2014, (iii) 12.12. 2014, (i) 15.12. 2014, (ii) 15.12. 2014, 16.12. 2014, (i)  18.12. 2014, (ii) 18.12. 2014, (iii) 18.12. 2014 19.12. 2014 24.12. 2014 26.12. 2014 29.12.2014, 30.12.2014, (i) 31.12.2014, (ii) 31.12.2014 5.01.2015 6.01.2015, (i)  12.01.2015, (ii) 12.01.2015, 13.01.2015, 16.01.2015, 19.01.2015 22.01.2015, 23.01.2015 23.01.2015 29.01.2015, (i) 05.02.2015, (ii)  05.02.2015, (i)  09.02.2015, (ii) 09.02.2015, 10.02.2015, 11.02.2015, 12.02.2015, 13.02.2015, (i) 16.02.2015, (ii) 16.02.2015, 17.02.2015, (i) 18.02.2015, (ii) 18.02.2015, 19.02.2015,   20.02.2015(i)  23.02.2015(ii) 23.02.2015(i) 24.02.2015, (ii) 24.02.2015, 25.02.2015(i)  2.03.2015(ii) 2.03.2015 3.03.2015 4.03.2015 9.03.2015, (i) 10.03.2015, (ii)  10.03.2015 11.03.2015 19.03.2015, 20.03.2015 23.03.2015, 25.03.2015 27.03.20151.04.2015, (i)  6.04.2015(ii)  6.04.2015(iii)  6.04.2015,   7.04.2015 9.04.2015 13.04.2015 15.04.2015, 16.04.2015, 20.04.2015,   22.04.2015 23.04.2015,   5.05.2015 6.05.2015 8.05.2015(i) 12.05.2015(ii)  12.05.201514.05.201515.05.2015, (i) 18.05.2015, (ii) 18.05.2015, 19.05.2015, 21.05.2015(i) 21.05.2015(ii) 22.05.2015,    25.05.2015, 27.05.2015 29.05.2015, 1.06.20152.06.2015 8.06.2015(i) 9.06.2015(ii)  9.06.2015,   10.06.2015,   (I)  12.06.2015(II) 12.06.2015(I) 15.06.2015(II) 15.06.2015(III) 15.06.201516.06.2015,   (i) 17.06.2015(ii) 17.06.2015(i)  18.06.2015(ii) 18.06.2015 19.06.2015 22.06.2015(i) 23.06.2015(ii) 23.06.201525.06.2015,   29.06.201501.07.2015 02.07.2015 03.07.201506.07.201507.07.201510.07.201513.07.2015(i) 15.07.2015(ii) 15.07.2015 16.07.201517.07.2015 22.07.2015 23.07.2015 27.07.201528.07.2015,  30.07.2015,  (i) 31.07.2015(ii) 31.07.2015(i) 3.08.2015(ii)  3.08.2015,   5.08.2015,   6.08.2015(i) 7.08.2015,   (ii)  7.08.2015 (i) 10.08.2015, (ii)  10.08.2015, (iii)10.08.2015,  11.08.2015, 13.08.2015,  14.08.2015,  17.08.2015, (i)  18.08.2015, (ii) 18.08.2015, (i) 19.08.2015, (ii) 19.08.2015,  (iii) 19.08.2015,  20.08.2015, 21.08.2015,  24.08.2015, (i) 25.08.2015, (ii) 25.08.2015, 26.08.2015, (i)  27.08.2015, (ii) 27.08.2015, (i) 31.08.2015, (ii)  31.08.2015,  1.09.2015,  2.09.2015,  3.09.2015,  4.09.2015, 7.09.2015,  9.09.2015, 11.09.2015,  (i) 14.09.2015, (ii) 14.09.2015,  (iii) 14.09.2015, (iv) 14.09.2015,   15.09.2015,  (i)  18.09.2015, (ii) 18.09.2015,  19.09.2015, (i)  28.09.2015, (ii)  28.09.2015, (iii) 28.09.2015, (i)  05.10.2015, (ii)  05.10.2015,  (iii) 05.10.2015,  08.10.2015,  (i)  12.10.2015,  (ii) 12.10.2015,  (iii) 12.10.2015,   20.10.2015,  21.10.2015,  26.10.2015, (i) 27.10.2015, (ii) 27.10.2015, (i) 29.10.2015, (ii) 29.10.2015,  30.10.2015,  2.11.2015,  3.11.2015,  5.11.2015, (i)  9.11.2015, (ii)  09.11.2015, 10.11.2015,  12.11.2015,  (i) 16.11.2015,  (ii) 16.11.2015,  19.11.2015, 24.11.2015,   26.11.2015, (i)  27.11.2015, (ii)  27.11.2015, (i)  30.11.2015, (ii)  30.11.2015, (i)  02.12.2015, (ii) 02.12.2015, (iii)  02.12.2015, (i)  04.12.2015, (ii)  04.12.2015, (i)  07.12.2015, (ii) 07.12.2015, (i)  14.12.2015, (ii)  14.12.2015, (i)  15.12.2015, (ii)  15.12.2015, (i) Record of Financial Bids on due date 17.12.2015, (ii) Record of Financial Bids on due date 17.12.2015, Record of Financial Bids on due date 18.12.2015, Record of Financial Bids on due date 29.12.2015, 04.01.2016, 06.01.2016, 07.01.2016, 11.01.2016, 12.01.2016, 28.01.2016(i), 28.01.2016(ii), 09.02.2016(i) 11.02.2016(ii) 11.02.2016(iii) 11.02.201617.02.201619.02.201622.02.2016, 23.02.2016, 24.02.2016(i) 25.02.2016(ii) 25.02.201629.02.2016, 01.03.201602.03.2016, (i) 04.03.2016, (ii) 04.03.2016, 08.03.2016, 10.03.2016, 18.03.2016, 21.03.2016, 22.03.2016, 23.03.2016, 31.03.20167.04.201611.04.2016(i) 18.04.2016, (ii) 18.04.201626.04.2016, 28.04.2016, 29.04.201602.05.2016, 05.05.2016, (i) 09.05.2016, (ii) 09.05.2016, (iii) 09.05.2016, 10.05.2016, (i) 11.05.2016, (ii) 11.05.2016, (iii) 11.05.2016, (iv) 11.05.2016,  (i) 18.05.2016, (ii)18.05.201620.05.2016 23.05.2016(i) 30.05.2016(ii) 30.05.2016 (ii) 30.05.20161.06.2016(i) 02.06.2016 , (ii) 02.06.2016 , 07.06.201613.06.2016(i) 20.06.2016(ii) 20.06.201624.06.201627.06.201604.07.2016(i) 05.07.2016,   (ii) 05.07.201615.07.2016, 18.07.2016, 19.07.2016, 20.07.2016, 21.07.201622.07.2016, 25.07.2016, (i) 26.07.2016(ii) 26.07.2016, 27.07.201628.07.2016, 04.08.2016, 05.08.2016, 09.08.2016, 16.08.2016, 17.08.2016(i)18.08.2016, (ii)18.08.2016, (i)19.08.2016, (ii)19.08.2016, 22.08.2016, 23.08.2016, 26.08.2016(i) 29.08.2016, (ii) 29.08.2016, 30.08.201605.09.2016, (i) 07.09.2016, (ii) 07.09.2016, (i) 14.09.2016, (ii) 14.09.2016, (iii) 14.09.2016, 16.09.2016(i) 22.09.2016(ii) 22.09.201623.09.201626.09.201628.09.201629.09.201603.10.201605.10.201607.10.201614.10.2016(i) 17.10.2016(ii) 17.10.201624.10.2016, (i) 25.10.2016, (ii) 25.10.201626.10.2016, 01.11.2016, 02.11.2016, (ii) 03.11.2016, (ii) 03.11.2016, (i) 04.11.2016, (ii) 04.11.2016, (i) 09.11.2016,   (ii) 09.11.201611.11.201616.11.2016(i) 17.11.2016(ii) 17.11.2016, (iii) 17.11.2016, 23.11.2016, 23.11.2016, (i) 24.11.2016, (ii) 24.11.2016, (iii) 24.11.2016, 25.11.2016(i) 01.12.2016(ii) 01.12.2016(iii) 01.12.2016(iv) 01.12.2016, 02.12.2016, (i) 05.12.2016, (ii) 05.12.2016, (iii) 05.12.2016, (i) 07.12.2016, (ii) 07.12.2016, 13.12.201616.12.201619.12.2016(i)19.12.2016(ii)19.12.2016(iii),  (i) 20.12.2016,  (ii) 20.12.2016(iii) 20.12.2016(i) 21.12.2016(ii) 21.12.2016, 22.12.2016, 03.01.2017(i) 04.01.2017, (ii) 04.01.2017, 06.01.2017, (i) 09.01.2017, (ii) 09.01.2017(i) 10.01.2017(ii) 10.01.201712.01.2017(i) 16.01.2017(ii) 16.01.2017, (iii) 16.01.2017, 18.01.2017(i)19.01.2017, (ii) 19.01.2017, (i) 23.01.2017, (ii) 23.01.201724.01.2017, 25.01.2017, 30.01.2017, 31.01.2017, 03.02.2017, (i) 06.02.2017, (ii) 06.02.2017, 08.02.2017, 09.02.2017, 10.02.2017, 10.02.2017, 13.02.2017, 13.02.2017, (i) 15.02.2017, (ii) 15.02.2017, (i) 16.02.2017, (ii) 16.02.2017, (i)7.02.2017(ii) 17.02.2017, (iii) 17.02.2017, (i) 20.02.2017, (ii) 20.02.2017(iii) 20.02.2017, 21.02.2017, (i)22.02.2017, (ii)22.02.2017, (iii)22.02.201723.02.2017(i)27.02.2017(ii)27.02.2017(iii)27.02.2017(i)28.02.2017(ii)28.02.2017,  (iii)28.02.20172.03.20173.03.2017,   7.03.20178.03.2017, (i)09.03.2017, (ii) 09.03.2017,  10.03.2017, (i) 14.03.2017, (ii) 14.03.2017, 15.03.201716.03.2017, 17.03.2017, (i) 20.03.2017, (ii) 20.03.2017, 22.03.2017, 23.03.2017, (i)03.04.2017, (ii) 03.04.2017, 10.04.2017(i) 12.04.2017, (ii) 12.04.2017, 13.04.2017, 17.04.2017, 18.04.201719.04.201720.04.2017, 24.04.2017, (i) 25.04.2017, (ii) 25.04.2017(iii) 25.04.2017, 27.04.2017, 28.04.2017, 02.05.2017, (i) 04.05.2017, (ii) 04.05.2017, 05.05.2017 & 08.05.201709.05.2017, 12.05.2017, (i) 16.05.2017, (ii) 16.05.2017, 18.05.2017, 19.05.2017, (i) 23.05.2017, (ii) 23.05.2017, (iii) 23.05.2017, (iv) 23.05.2017, (v) 23.05.2017, (i) 24.05.2017, (ii) 24.05.2017, 26.05.201730.05.2017(i) 31.05.2017, (ii)31.05.2017, 01.06.201702.06.2017, 06.06.2017, (i) 07.06.2017(ii) 07.06.2017,   (iii)07.06.2017, 09.06.2017(i)12.06.2017(ii)12.06.2017(iii)12.06.201714.06.201720.06.2017, 20.06.2017 & 21.06.201721.06.201728.06.201729.06.2017 & 30.06. 201704.07. 2017, 06.07.2017, 11.07.201713.07.2017 & 14.07.2017(i) 18.07.2017(ii) 18.07.2017,  (iii) 18.07.2017,  20.07.2017 & 26.07.2017, 03.08.2017 (i)04.08.2017, (ii) 04.08.2017, (iii) 04.08.2017, 07.08.2017, (i)08.08.2017, (ii) 08.08.2017, (i) 11.08.2017, (ii) 11.08.2017, (iii) 11.08.2017, 16.08.2017, 17.08.2017,

Note : Tender Notices/Document is in a Pre-defined Format (PDF) that 
opens in Acrobat Reader only .In case, Acrobat Reader is not available , it can be downloaded from
www.adobe.com

This page was last updated on :
18th August  2017
.....................
Visitors:

Number of Visitor at NHAI Web Site(http://www.nhai.org/)

In case of any difficulty in downloading the Tender Notices/Documents,
Please contact : Web Admin
Tel :+ 91 (011) 25074100 & 25074200 , Ext. 1517
Email :nhai.org@gmail.comweb-admin@nhai.org


Home | Indian Road Network | Mandate | Government Policy Incentives | Programmes | Project Maps | Concession Agreement | Procurement | Organizational Structure | Contact | Piu