Projects Under Implementation as on 30th June 2010
|
S.no |
Stretch | NH No | Length(Km) | ||
| On Golden Quadrilateral | |||||
Kolkata to Delhi on NH 2 |
|||||
1 |
Fatehpur - Khaga (TNHP/II-C) | 2 | 77 | ||
2 |
Varanasi - Mohania (GTRIP/IV-A) | 2 | 76 | ||
3 |
Gorhar - Barwa Adda (TNHP/V-C) | 2 | 78.75 | ||
4 |
Agra-Shikohabad (GTRIP/I-A) | 2 | 50.83 | ||
Mumbai to Chennai on NH 4,7 and 46 |
|||||
5 |
Haveri - Harihar | 4 | 56 | ||
6 |
Tumkur Bypass | 4 | 13 | ||
7 |
Chitradurga Bypass | 4 | 18 | ||
8 |
Harihar - Chitradurga | 4 | 77 | ||
Chennai to Kolkata on NH 5,6 and 60 |
|||||
9 |
Sunakhala - Ganjam (OR-VII) | 5 | 55.713 | ||
10 |
Bhubaneswar - Khurda (OR-I) | 5 | 27.15 | ||
11 |
Balasore - Bhadrak (OR-III) | 5 | 62.64 | ||
12 |
Ganjam - Icchapuram (OR-VIII) | 5 | 50.8 | ||
13 |
Bridges section (WB-III) | 6 | 1.732 | ||
| On North South & East West Corridor Phase I | |||||
East-West |
|||||
14 |
Lucknow - Kanpur (EW/3B) | 25 | 16 | ||
15 |
Purnea - Gayakota (EW-12/BR) | 31 | 28 | ||
16 |
Lucknow Bypass (EW-15/UP) | 56A & B | 22.85 | ||
North-South |
|||||
17 |
Six laning of Panchi Gujran to Kamaspur (Sonepat) (NS-17/HR) | 1 | 21.7 | ||
18 |
Eight laning of Haryana/ Delhi Border to Mukaraba Chowk (NS-18/DL) | 1 | 12.9 | ||
19 |
Kunjwani to Vijaypur (NS-15/J&K) | 1A | 17.2 | ||
20 |
Gundla Pochampalli to Bowenpalli Shivarampalli to Thondapalli (NS-23/AP) | 7 | 23.1 | ||
| On North South & East West Corridor Phase II | |||||
East-West |
|||||
21 |
Gagodhar to Garamore (Package-IV) | 15, 8A | 90.3 | ||
22 |
Bara to Orai | 2, 25 | 62.8 | ||
23 |
Orai to Jhansi (UP-5) | 25 | 50 | ||
24 |
Orai to Jhansi (UP-4) | 25 | 66 | ||
25 |
Ganga Bridge to Rama Devi Crossing (UP-6) | 25 | 5.6 | ||
26 |
Jhansi Bypass (UP-3) | 25 | 15 | ||
27 |
Ayodhya-Lucknow (LMNHP-3) | 28 | 41.925 | ||
28 |
Kasia to Gorakhpur (LMNHP-7) | 28 | 40 | ||
29 |
Kotwa to Dewapur (LMNHP-10) | 28 | 38 | ||
30 |
Gorakhpur-Ayodhya (LMNHP-5) | 28 | 44 | ||
31 |
Muzzaffarpur to Mehsi (LMNHP-12) | 28 | 40 | ||
32 |
Ayodhya-Lucknow (LMNHP-1) | 28 | 36 | ||
33 |
Gorakhpur-Ayodhya (LMNHP-4) | 28 | 29 | ||
34 |
Gorakhpur Bypass | 28 | 32.6 | ||
35 |
Ayodhya-Lucknow (LMNHP-2) | 28 | 47 | ||
36 |
Mehsi to Kotwa (LMNHP-11) | 28 | 40 | ||
37 |
UP/Bihar Border to Kasia (LMNHP-8) | 28 | 41.115 | ||
38 |
Gorakhpur-Ayodhya (LMNHP-6) | 28 | 44.86 | ||
39 |
Deewapur to UP/Bihar Border (LMNHP-9) | 28 | 41.085 | ||
40 |
Nalbari to Bijni (AS-6) | 31 | 25 | ||
41 |
Nalbari to Bijni (AS-7) | 31 | 27.3 | ||
42 |
Nalbari to Bijni (AS-9) | 31 | 21.5 | ||
43 |
Brahmputra Bridge (AS-28) | 31 | 5 | ||
44 |
Nalbari to Bijni (AS-8) | 31 | 30 | ||
45 |
Siliguri to Islampur (WB-7) | 31 | 26 | ||
46 |
Guwahati to Nalbari (AS-4) | 31 | 28 | ||
47 |
Guwahati to Nalbari (AS-5) | 31 | 28 | ||
48 |
Assam/WB Border to Gairkatta (WB-1) | 31C | 32 | ||
49 |
Bijni to Assam/WB Border (AS-11) | 31C | 30 | ||
50 |
Bijni to Assam/WB Border (AS-12) | 31C | 30 | ||
51 |
Bijni to Assam/WB Border (AS-10) | 31C | 33 | ||
52 |
Daboka to Nagaon (AS-17) | 36 | 30.5 | ||
53 |
Dharamtul to Sonapur (AS-19) | 37 | 25 | ||
54 |
Sonapur to Guwahati (AS-3) | 37 | 19 | ||
55 |
Nagaon bypass (AS-18) | 37 | 23 | ||
56 |
Nagaon to Dharmatul (AS-2) | 37 | 25 | ||
57 |
Dharamtul to Sonapur (AS-20) | 37 | 22 | ||
58 |
Harangajo to Maibang (AS-22) | 54 | 24 | ||
59 |
Silchar-Udarband (AS-1) | 54 | 32 | ||
60 |
Harangajo to Maibang (AS-21) | 54 | 26 | ||
61 |
Maibang to Lumding (AS-25) | 54 | 28 | ||
62 |
Maibang to Lumding (AS-24) | 54 | 15 | ||
63 |
Lumding to Daboka (AS-15) | 54 | 18.5 | ||
64 |
Maibang to Lumding (AS-26) | 54 | 23 | ||
65 |
Lanka to Daboka (AS-16) | 54 | 24 | ||
66 |
Maibang to Lumding (AS-27) | 54 | 21 | ||
67 |
Harangajo to Maibang (AS-23) | 54 | 16 | ||
68 |
Jhanjhapur to Darbanga (BR-7) | 57 | 37.59 | ||
69 |
Forbesganj-Simrahi (BR-3) | 57 | 34.87 | ||
70 |
Simrahi to Ring bund (missing link) (BR-4) | 57 | 15.15 | ||
71 |
Ring bunds to Jhanjharpur (BR-6) | 57 | 38.55 | ||
72 |
Darbanga to Muzzaffarpur (BR-8) | 57 | 32.05 | ||
73 |
Purnea-Forbesganj (BR-2) | 57 | 36.7 | ||
74 |
Darbanga to Muzzaffarpur (BR-9) | 57 | 37.75 | ||
75 |
Kosi Bridge including approaches and Guide Bond & Afflux Bond (BR-5) | 57 | 10.63 | ||
76 |
Kota Bypass (RJ-4) | 76 | 26.42 | ||
77 |
Chambal Bridge (RJ-5) | 76 | 1.4 | ||
North-South |
|||||
78 |
Panipat to Panchi Gujran (Six laning work) (NS-89/HR) | 1 | 20 | ||
79 |
Pathankot to Bhogpur (NS-38/PB) | 1A | 44 | ||
80 |
Pathankot to Bhogpur (NS-37/PB) | 1A | 40 | ||
81 |
Chenani-Nashri | 1A | 12 | ||
82 |
Jammu to Kunjwani (Jammu Bypass) NS-33/J&K | 1A | 15 | ||
83 |
Vijaypur to Pathankot (NS-34/J&K) | 1A | 33.65 | ||
84 |
Vijaypur to Pathankot (NS-35/J&K) | 1A | 30 | ||
85 |
Pathankot to Jammu & Kashmir Border (NS-36/J&K) | 1A | 19.65 | ||
86 |
Srinagar Bypass (Road Portion)(NS-30) | 1A | 17.8 | ||
87 |
Jammu - Udhampur | 1A | 65 | ||
88 |
Srinagar Bypass (Bridge Portion) (NS-30A) | 1A | 1.23 | ||
89 |
Quazigund-Banihal | 1A | 15.25 | ||
90 |
New 4 laning Agra Bypass (NS-1/UP-1) | 2,3 | 32.8 | ||
91 |
Jhansi to Lalitpur (NS-1/BOT/UP-2) | 25, 26 | 49.7 | ||
92 |
Rajmarg Choraha to Lahknadon (ADB-II/C-8) | 26 | 54 | ||
93 |
Sagar -Rajmarg Choraha (ADB-II/C-6) | 26 | 44 | ||
94 |
Rajmarg Choraha to Lakhandon (ADB-II/C-9) | 26 | 54.7 | ||
95 |
Lalitpur - Sagar (ADB-II/C-4) | 26 | 55 | ||
96 |
Sagar Bypass (ADB-II/C-5) | 26 | 26 | ||
97 |
Sagar Rajmarg choraha (ADB-II/C-7) | 26 | 43.162 | ||
98 |
Lalitpur Sagar (ADB-II/C-3) | 26 | 38 | ||
99 |
Jhansi to Lalitpur (NS-1/BOT/UP-3) | 26 | 49.3 | ||
100 |
Dholpur - Morena Section (including chambal bridge) NS-1/RJ-MP/1 | 3 | 10 | ||
101 |
Chengapalli to Coimbatore Bypass and End of Coimbatore Bypass to TN/Kerala Border | 47 | 54.83 | ||
102 |
Thrissur to Angamali (KL-I) | 47 | 40 | ||
103 |
Six lanning of Vadakkancherry - Thrissuresection | 47 | 30 | ||
104 |
Islam Nagar to Kadtal (NS-2/BOT/AP-7) | 7 | 53.01 | ||
105 |
Hyderabad Bangalore section (ADB-11/C-14) | 7 | 42 | ||
106 |
Hyderabad Bangalore section (ADB-11/C-10) | 7 | 40 | ||
107 |
Borkhedi-Jam (NS-22/MH) | 7 | 27.4 | ||
108 |
Hyderabad Bangalore section (ADB-11/C-13) | 7 | 40 | ||
109 |
MH/AP border to Islam Nagar (NS-2/BOT/AP-6) | 7 | 54.6 | ||
110 |
Hyderabad Bangalore section (ADB-11/C-11) | 7 | 42.4 | ||
111 |
Hyderabad Bangalore section (ADB-11/C-15) | 7 | 45.6 | ||
112 |
Hyderabad Bangalore section (ADB-11/C-12) | 7 | 42.6 | ||
113 |
Madurai-Kanniakumari Section (NS-42/TN) | 7 | 42.7 | ||
114 |
Lakhnadon to MP/MH Border (NS-1/BOT/MP-2) | 7 | 49.35 | ||
115 |
Kelapur-Pimpalkhatti (NS-62) | 7 | 22 | ||
116 |
Devdhari-Kelapur (NS-61/MH) | 7 | 30 | ||
117 |
Wadner-Devdhari (NS-60/MH) | 7 | 29 | ||
118 |
Kanniyakumari-Panagudi(NS-32) | 7 | 31.7 | ||
119 |
Madurai-Kanniakumari Section(NS-41/TN) | 7 | 39.51 | ||
120 |
Lakhnadon to MP/MH Border (NS-1/BOT/MP-3) | 7 | 56.475 | ||
121 |
Four laning from MP/Maharashtra border to Nagpur I/C Kamptee Kanoon and Nagpur bypass | 7 | 95 | ||
122 |
Butibori ROB(NS-29/MH) | 7 | 1.8 | ||
123 |
Jam-Wadner (NS-59/MH) | 7 | 30 | ||
124 |
Armur to Kadloor Yellareddy (NS-2/AP-1) (Approved Length 60.25) | 7 | 59 | ||
125 |
Gwalior - Jhansi | 75 | 80 | ||
126 |
Gwalior Bypass (NS-1/BOT/MP-1) | 75, 3 | 42 | ||
| On Port Connectivity | |||||
Port Connectivity |
|||||
127 |
New Mangalore Port | 13, 17 & 48 | 37 | ||
128 |
Haldia Port | 41 | 53 | ||
129 |
Cochin Port | 47 | 10 | ||
130 |
Tuticorin Port | 7A | 47.2 | ||
131 |
Chennai - Ennore Express Way | SR | 9 | ||
| Other Phase II Projects | |||||
|
|||||
132 |
Garhmukteshwar - Muradabad | 24 | 56.25 | ||
133 |
Hapur - Garhmukteshwar | 24 | 35 | ||
134 |
Chennai Bypass Phase II | 45, 4 & 5 | 32 | ||
| NHDP Phase III | |||||
NHDP Phase IIIA |
|||||
135 |
Amritsar - Wagha border | 1 | 36.22 | ||
136 |
Jalandhar - Amritsar | 1 | 49 | ||
137 |
Delhi/Haryana Border to Rohtak | 10 | 63.49 | ||
138 |
Jaipur-Reengus(Approved Length 52.65 Km ) | 11 | 54 | ||
139 |
Jaipur-Tonk - Deoli(Approved Length 148.77 Km ) | 12 | 150 | ||
140 |
Deoli - Kota | 12 | 83 | ||
141 |
Hungund-Hospet (Approved Length 194 Km) | 13 | 97.89 | ||
142 |
Bijapur - Hungund Section (Approved Length 194 Km) | 13 | 97.22 | ||
143 |
Amritsar - Pathankot (Approved Length 101Km) | 15 | 106 | ||
144 |
Kundapur-Surathkal & Mangalore-KNT/Kerala Border | 17 | 90 | ||
145 |
Patna- Muzzaffarpur | 19 & 77 | 63 | ||
146 |
Hyderabad-Yadgiri (Approved Length 30) | 202 | 35.65 | ||
147 |
Bhubneshwar-Puri(Approved Length 59 Km) | 203 | 67 | ||
148 |
Tirupati -Tiruthani - Chennai(Approved Length 125.5 Km) | 205 | 124.7 | ||
149 |
Kurali - Kiratpur | 21 | 42.9 | ||
150 |
Two Laning of Trichy - Karaikudi and Trichy Bypass(Approved Length 100 Km) | 210 & 67 | 110.372 | ||
151 |
Rimoli - Roxy - Rajamunda(Approved Length 163Km) | 215 | 96 | ||
152 |
Zirakpur - Parwanoo | 22 | 28.69 | ||
153 |
Sitapur - Lucknow | 24 | 75 | ||
154 |
Pimpalgaon - Nasik - Gonde | 3 | 60 | ||
155 |
Khalghat - MP/Maharashtra Border | 3 | 82.8 | ||
156 |
Gonde-Vadape (Thane) | 3 | 100 | ||
157 |
MP/Maharashtra Border-Dhule | 3 | 98 | ||
158 |
Hazaribagh-Ranchi | 33 | 75 | ||
159 |
Banglore - Neelamangala | 4 | 19.5 | ||
160 |
Banglore-Hoskote-Mudbagal Section | 4 | 79.724 | ||
161 |
Trichy - Dindigul | 45 | 88.273 | ||
162 |
Madurai-Arupukottai-Tuticorin | 45B | 128.16 | ||
163 |
Charthalai-ochira | 47 | 83.6 | ||
164 |
Devihalli-Hassan(Approved Length 73 Km) | 48 | 77.23 | ||
165 |
Neelamangala Junction on NH 4 with NH 48 to Devihalli | 48 | 81 | ||
166 |
Meerut-Muzaffarnagar | 58 | 79 | ||
167 |
Muzaffarnagar - Haridwar (Approved Length 77 ) | 58, 72 | 80 | ||
168 |
Nagpur - kondhali | 6 | 40 | ||
169 |
Chattisgarh / Maharashtra Border - Wainganga Bridge | 6 | 80.055 | ||
170 |
Aurang - Raipur | 6 | 43.485 | ||
171 |
End of Durg Bypass - Chattisgarh / Maharashtra Border | 6 | 82.685 | ||
172 |
Pondicherry - Tindivanam | 66 | 38.61 | ||
173 |
Trichy - Karur | 67 | 79.7 | ||
174 |
Thanjarur - Trichy | 67 | 56 | ||
175 |
Salem-Ulundrupet (BOT-1/TN-06) | 68 | 136.357 | ||
176 |
Rohtak - Bawal(Approved Length 97 Km) | 71 | 82.553 | ||
177 |
Panipat - Rohtak(Approved Length 73 Km) | 71A | 80.858 | ||
178 |
Haridwar - Dehradun (Approved Length 69) | 72 | 39 | ||
179 |
Kandla - Mundra Port(Approved Length 73 Km) | 8A | 71.4 | ||
180 |
Hyderabad-Vijayawada | 9 | 181.63 | ||
|
|||||
181 |
4-lanning of Kannur Vengalem Kuttipuram (Package -II) | 17 | 81.5 | ||
182 |
KNT/Kerala Border to Kanuur Section(Approved Length 286.3) | 17 | 126.6 | ||
183 |
4-lanning of Kannur Vengalem Kuttipuram (Package -I) | 17 | 83.2 | ||
184 |
4/6 Laning of Maharastra/Goa Border - Panaji Goa/KNT Border | 17 | 139 | ||
185 |
Cuddapah-Mydukur-Kurnool | 18 | 188.752 | ||
186 |
4 Laning of Chappra-Hajipur(Approved Length 153 Km) | 19 | 65 | ||
187 |
2 Laning of Dindigul-Perigulam-Theni-Kumili | 220 | 134 | ||
188 |
Muradabad-Bareily (Approved Length 112) | 24 | 121 | ||
189 |
Bareily - Sitapur(Approved Length 134 Km) | 24 | 151.2 | ||
190 |
4 Laning of Barhi - Hazaribagh(Approved Length 40 Km) | 33 | 41.314 | ||
191 |
4 Laning of Faraka-Raiganj | 34 | 103 | ||
192 |
4 Laning of Raiganj-Dalkola | 34 | 50 | ||
193 |
4 Laning of Brahampore-Faraka | 34 | 103 | ||
194 |
Panji-Goa/Karnatka Border | 4A | 69 | ||
195 |
2 Laning of Forbesganj-Jogwani(Approved Length 13 Km) | 57A | 9.258 | ||
196 |
4 Laning of Godhara to Gujarat /MP Border(Approved Length 210 Km) | 59 | 87.285 | ||
197 |
Indore-Jhabua-Gujrat/MP (Approved Length 168) | 59 | 155.15 | ||
198 |
4 Laning of Ahmedabad to Godhara (Approved Length 210 Km) | 59 | 117.6 | ||
199 |
Talegaon-Amravat(Approved Length 58Km) | 6 | 67.8 | ||
200 |
Gujarat/Maharashtra Border-Surat - Hazira Port Section | 6 | 132.9 | ||
201 |
Sambalpur-Baragarh-Chattisgarh/Orrisa Border | 6 | 88 | ||
202 |
Kishangarh-Ajmer-Beawar | 8 | 82 | ||
203 |
2 Laning of Mokama-Munger(Approved Length 70 Km) | 80 | 69.27 | ||
204 |
Bhopal-Sanchi(Approved Length 40 Km) | 86Ex | 53.78 | ||
205 |
Pune-Sholapur Pkg-I(Approved Length Pkg I & II 170 Km) | 9 | 110.05 | ||
206 |
Pune-Sholapur Pkg-II(Approved Length I & II 170 Km) | 9 | 105 | ||
207 |
Ghaziabad-Aligarh (Approved Length 106 ) | 91 | 126 | ||
| NHDP Phase V | |||||
NHDP Phase V |
|||||
208 |
Panipat - Jalandhar (Six lane) | 1 | 291 | ||
209 |
Badarpur Elevated Highways | 2 | 4.4 | ||
210 |
Delhi - Agra(Approved Length 180.3 Km) | 2 | 179.5 | ||
211 |
Varanasi-Aurangabad | 2 | 192.4 | ||
212 |
Indore-Dewas(Approved Length 55 Km) | 3 | 45.05 | ||
213 |
Pune – Satara(Approved Length 145) | 4 | 140.35 | ||
214 |
Belgaum-Dharwad(Approved Length 111 Km) | 4 | 80 | ||
215 |
Chitradurga -Tumkur Bypass(Approved Length 145 Km) | 4 | 114 | ||
216 |
Six Laning of Krishnagiri-walajhapet section | 46 | 148.3 | ||
217 |
Chilkaluripet - Vijayawada (Six lane) | 5 | 82.5 | ||
218 |
Chennai - Tada (Six lane) | 5 | 43.4 | ||
219 |
Six Laning of Nellore-Chilkaluripet | 5 | 183.52 | ||
220 |
Six Laning of Chandikhol-Jagatpur-Bhubaneswar(Approved Length 61 Km) | 5 | 67 | ||
221 |
Six Laning of Hosur-Krishnagiri | 7 | 59.87 | ||
222 |
Surat - Dahisar (Six lane) | 8 | 239 | ||
223 |
Gurgaon - Kotputli - Jaipur (Six lane) | 8 | 225.6 | ||
224 |
Samaikhiali-Gandhidham | 8A | 56.16 | ||
| NH-34 | |||||
NH-34 |
|||||
225 |
Dalkola Bypass | 34 | 5.5 | ||
| NHDP Phase IV | |||||
|
|||||
226 |
4 Laning of Nagpur Betul | 69 | 176.3 | ||
| NHDP Phase VII | |||||
227 |
New 4-Lane Elevated Road from Chennai Port - Maduravoyal | 4 | 19 | ||
228 |
Upgradation of Hyderabad-Bangalore Section | 7 | 22.12 | ||
| Others(Misc.) | |||||
229 |
NH Connectivity to ICTT Vallarpadam | 47C | 17.2 | ||
| Port Connectivity(Misc.) | |||||
Port Connectivity |
|||||
230 |
Chennai - Ennore Express Way | SR | 15 | ||
| SARDP | |||||
|
|||||
231 |
Jorbat-Barapani | 40 | 61.8 | ||
232 |
Shilong-Bypass | 40 & 44 | 50 | ||
|
|